Case study on improvement of cycle time for the logistic design layout in automative industry

Access is limited to UniMAP community.

Saved in:
Bibliographic Details
Main Author: Mohd Syedi Imran, Mohd Dawi
Other Authors: Azmi Harun
Format: Learning Object
Language:English
Published: Universiti Malaysia Perlis 2012
Subjects:
Online Access:http://dspace.unimap.edu.my/xmlui/handle/123456789/22170
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.unimap-22170
record_format dspace
spelling my.unimap-221702012-12-09T03:21:05Z Case study on improvement of cycle time for the logistic design layout in automative industry Mohd Syedi Imran, Mohd Dawi Azmi Harun Automotive industry Manpower Cycle time Access is limited to UniMAP community. This case study is done in one of the automotive industry in Malaysia. It took place at the Logistic Department. Current layout design and manpower distribution is improved to reduce the gap between Cycle Time and plan manpower quantity and to match the Cycle Time with actual allocated manpower quantity with the help of new layout design. The improvement is done by collecting data at the selected automotive industry and followed by series of analysis. The warehouse layout is done to improve the production layout using AutoCAD 2005 and Microsoft Excel 2007 software. The data based on new layout is computed by Cycle Time equation to determine the cycle time, total needed manpower and manpower efficiency. The result of calculation is analyzed and improvement process is done to achieve objectives. The result of improvement is presented by graph of manpower efficiency that shows comparison before and after improvement for each section. Section involved is CKD, Hako (CKD) and Local area. At the end of this case study, new layout is designed at CKD area, manpower efficiency is increased and manpower quantity is reduced. 2012-12-09T03:21:05Z 2012-12-09T03:21:05Z 2009-05 Learning Object http://hdl.handle.net/123456789/22170 en Universiti Malaysia Perlis School of Manufacturing Engineering
institution Universiti Malaysia Perlis
building UniMAP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Perlis
content_source UniMAP Library Digital Repository
url_provider http://dspace.unimap.edu.my/
language English
topic Automotive industry
Manpower
Cycle time
spellingShingle Automotive industry
Manpower
Cycle time
Mohd Syedi Imran, Mohd Dawi
Case study on improvement of cycle time for the logistic design layout in automative industry
description Access is limited to UniMAP community.
author2 Azmi Harun
author_facet Azmi Harun
Mohd Syedi Imran, Mohd Dawi
format Learning Object
author Mohd Syedi Imran, Mohd Dawi
author_sort Mohd Syedi Imran, Mohd Dawi
title Case study on improvement of cycle time for the logistic design layout in automative industry
title_short Case study on improvement of cycle time for the logistic design layout in automative industry
title_full Case study on improvement of cycle time for the logistic design layout in automative industry
title_fullStr Case study on improvement of cycle time for the logistic design layout in automative industry
title_full_unstemmed Case study on improvement of cycle time for the logistic design layout in automative industry
title_sort case study on improvement of cycle time for the logistic design layout in automative industry
publisher Universiti Malaysia Perlis
publishDate 2012
url http://dspace.unimap.edu.my/xmlui/handle/123456789/22170
_version_ 1643790742708027392
score 13.222552