Project ID : An Application Of Carrier E 20 HAP

This final year project report details is about to get a total cooling load for UniKLMFI new building that located in, Bangi. This building generally is for education for UniKLMFI students.There is much multipurpose room to calculate the load with different criteria...

Full description

Saved in:
Bibliographic Details
Main Authors: Juliana Abd Ghani, Muhd Anuar Muhd Helmi, Nik Mohd Alif Nik Yahaya
Format:
Published: 2014
Online Access:http://localhost/xmlui/handle/123456789/6849
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This final year project report details is about to get a total cooling load for UniKLMFI new building that located in, Bangi. This building generally is for education for UniKLMFI students.There is much multipurpose room to calculate the load with different criteria of each room. Design criteria include all the equipment, materials using in the building band according to the design condition state in ASHRAE STD. After analyze the information, the load for overall building estimation was done using by E-20 Carrier Hourly Analysis Program 4.40 Software with taking into account about lighting, electrical equipment, occupancy, infiltration and walls, windows, and doors. The suitable air conditioning system for this building must install to give a comfort condition to students and all lecturers for each room and also can reduce monthly or yearly electricity cost.