Project ID : An Application Of Carrier E 20 HAP
This final year project report details is about to get a total cooling load for UniKLMFI new building that located in, Bangi. This building generally is for education for UniKLMFI students.There is much multipurpose room to calculate the load with different criteria...
Saved in:
Main Authors: | , |
---|---|
Format: | |
Published: |
2014
|
Online Access: | http://localhost/xmlui/handle/123456789/6849 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | This final year project report details is about to get a total cooling load for
UniKLMFI new building that located in, Bangi. This building generally is for education
for UniKLMFI students.There is much multipurpose room to calculate the load with
different criteria of each room. Design criteria include all the equipment, materials using
in the building band according to the design condition state in ASHRAE STD.
After analyze the information, the load for overall building estimation was done
using by E-20 Carrier Hourly Analysis Program 4.40 Software with taking into account
about lighting, electrical equipment, occupancy, infiltration and walls, windows, and
doors. The suitable air conditioning system for this building must install to give a comfort
condition to students and all lecturers for each room and also can reduce monthly or
yearly electricity cost. |
---|