Estimation method of Interpass time for the control of temperature during a directed energy deposition process of a Ti–6Al–4V planar layer
Directed energy deposition (DED) provides a promising additive manufacturing method to fabricate and repair large metallic parts. However, it may suffer from excessive heat accumulation due to a high build rate, particularly during a wire feeding-type DED process. The implementation of interpass tim...
Saved in:
Main Authors: | Chua, Bih Lii, Ahn, Dong-Gyu |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI
2020
|
Subjects: | |
Online Access: | https://eprints.ums.edu.my/id/eprint/42460/1/FULL%20TEXT.pdf https://eprints.ums.edu.my/id/eprint/42460/ http://dx.doi.org/10.3390/ma13214935 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
IUK 304 - PENGURUSAN KUALITI INDUSTRI APRIL-MEI 06.
by: PPTI, Pusat Pengajian Teknologi Industri
Published: (2006) -
EPM 322(3) - KEJURUTERAAN INDUSTRI FEB-MAC 03.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2003) -
EPM 361E(3) - PENGURUSAN PROJEK OKT 04.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004) -
EPM 372(3) - PENGURUSAN KEJURUTERAAN II FEB-MAC 03.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2003) -
EPM 322(3) - KEJURUTERAAN INDUSTRI APRIL-MEI 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)