Multi-objective integrated production planning model and simulation constrained doubly by resources and materials
Based on analysing the defects of ERP planning system and researching related literatures, a multi objective integrated production planning model is constructed which is constrained double by resources and materials. The model tekes delivery on-tome, reduces inventory , reduces overtime work, meinta...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
2016
|
Online Access: | https://eprints.ums.edu.my/id/eprint/20591/1/Multi%20objective%20integrated%20production%20planning%20model%20and%20simulation%20constrained%20doubly%20by%20resources%20and%20materials.pdf https://eprints.ums.edu.my/id/eprint/20591/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.ums.eprints.20591 |
---|---|
record_format |
eprints |
spelling |
my.ums.eprints.205912018-08-07T07:14:31Z https://eprints.ums.edu.my/id/eprint/20591/ Multi-objective integrated production planning model and simulation constrained doubly by resources and materials Wang Cheng Liu, Xiao bing Zhao, Guo zhi Chin, Kim On Based on analysing the defects of ERP planning system and researching related literatures, a multi objective integrated production planning model is constructed which is constrained double by resources and materials. The model tekes delivery on-tome, reduces inventory , reduces overtime work, meintains safety inventory as its optimization objectives, and can achieve the integrated optimization method provided by the model has strong feasibility and effectness. 2016 Article PeerReviewed text en https://eprints.ums.edu.my/id/eprint/20591/1/Multi%20objective%20integrated%20production%20planning%20model%20and%20simulation%20constrained%20doubly%20by%20resources%20and%20materials.pdf Wang Cheng and Liu, Xiao bing and Zhao, Guo zhi and Chin, Kim On (2016) Multi-objective integrated production planning model and simulation constrained doubly by resources and materials. International Journal of Simulation Modelling, 13 (2). pp. 243-254. ISSN 1726-4529 |
institution |
Universiti Malaysia Sabah |
building |
UMS Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Sabah |
content_source |
UMS Institutional Repository |
url_provider |
http://eprints.ums.edu.my/ |
language |
English |
description |
Based on analysing the defects of ERP planning system and researching related literatures, a multi objective integrated production planning model is constructed which is constrained double by resources and materials. The model tekes delivery on-tome, reduces inventory , reduces overtime work, meintains safety inventory as its optimization objectives, and can achieve the integrated optimization method provided by the model has strong feasibility and effectness. |
format |
Article |
author |
Wang Cheng Liu, Xiao bing Zhao, Guo zhi Chin, Kim On |
spellingShingle |
Wang Cheng Liu, Xiao bing Zhao, Guo zhi Chin, Kim On Multi-objective integrated production planning model and simulation constrained doubly by resources and materials |
author_facet |
Wang Cheng Liu, Xiao bing Zhao, Guo zhi Chin, Kim On |
author_sort |
Wang Cheng |
title |
Multi-objective integrated production planning model and simulation constrained doubly by resources and materials |
title_short |
Multi-objective integrated production planning model and simulation constrained doubly by resources and materials |
title_full |
Multi-objective integrated production planning model and simulation constrained doubly by resources and materials |
title_fullStr |
Multi-objective integrated production planning model and simulation constrained doubly by resources and materials |
title_full_unstemmed |
Multi-objective integrated production planning model and simulation constrained doubly by resources and materials |
title_sort |
multi-objective integrated production planning model and simulation constrained doubly by resources and materials |
publishDate |
2016 |
url |
https://eprints.ums.edu.my/id/eprint/20591/1/Multi%20objective%20integrated%20production%20planning%20model%20and%20simulation%20constrained%20doubly%20by%20resources%20and%20materials.pdf https://eprints.ums.edu.my/id/eprint/20591/ |
_version_ |
1760229735298760704 |
score |
13.211869 |