Model of quality improvement and risk mitigation in the supply chain of concrete spun piles industry
Pile foundations are construction parts made of wood, concrete and or steel, which are used to transmit surface loads to a lower surface level in the soil mass, these products are generally used in road projects (toll roads or national roads), wharves, airports and others. In the pile industry, prod...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
AIP Publishing
2024
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/43409/1/publication9.pdf http://umpir.ump.edu.my/id/eprint/43409/ https://doi.org/10.1063/5.0235717 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.ump.umpir.43409 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.434092025-01-03T07:25:32Z http://umpir.ump.edu.my/id/eprint/43409/ Model of quality improvement and risk mitigation in the supply chain of concrete spun piles industry Mahardhika, Welly Iveline Anne Marie, . Surjasa, Dadang Mohd Yazid, Abu T Technology (General) TA Engineering (General). Civil engineering (General) TS Manufactures Pile foundations are construction parts made of wood, concrete and or steel, which are used to transmit surface loads to a lower surface level in the soil mass, these products are generally used in road projects (toll roads or national roads), wharves, airports and others. In the pile industry, product defects often occur, such as broken PC bars, cracks in stock, dry concrete, broken end plates and etc. These defect products can result in products not being able to become work in progress (WIP) or income for the company, WIP is divided into WIP 1 (products that are recognized by consumers) and WIP 2 (products that have not / are not recognized by consumers). In this study the intention was to design a pile product quality improvement and to mitigate activity risks in order to reduce the impact of product failure. Six Sigma DMAIC, namely Sub Model 1 Define, Sub Model 2 Measure, Sub Model 3 Analyze, Sub Model 4 Improvement and Sub Model 5 Control while the Risk Mitigation Model has 4 sub models that use the Risk Management approach, namely Sub Model 1 Risk Identification, Sub Model 2 Risk Analysis, Sub Model 3 Risk Evaluation and Sub Model 4 Risk Reduction. AIP Publishing 2024-11-25 Conference or Workshop Item PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/43409/1/publication9.pdf Mahardhika, Welly and Iveline Anne Marie, . and Surjasa, Dadang and Mohd Yazid, Abu (2024) Model of quality improvement and risk mitigation in the supply chain of concrete spun piles industry. In: AIP Conference Proceedings. AIP Conference Proceedings: 18th International Conference on Quality in Research, QiR 2023 , 23 - 25 October 2023 , Bali, Indonesia. pp. 1-15., 3215 (090016). ISSN 0094-243X (Published) https://doi.org/10.1063/5.0235717 |
institution |
Universiti Malaysia Pahang Al-Sultan Abdullah |
building |
UMPSA Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang Al-Sultan Abdullah |
content_source |
UMPSA Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
T Technology (General) TA Engineering (General). Civil engineering (General) TS Manufactures |
spellingShingle |
T Technology (General) TA Engineering (General). Civil engineering (General) TS Manufactures Mahardhika, Welly Iveline Anne Marie, . Surjasa, Dadang Mohd Yazid, Abu Model of quality improvement and risk mitigation in the supply chain of concrete spun piles industry |
description |
Pile foundations are construction parts made of wood, concrete and or steel, which are used to transmit surface loads to a lower surface level in the soil mass, these products are generally used in road projects (toll roads or national roads), wharves, airports and others. In the pile industry, product defects often occur, such as broken PC bars, cracks in stock, dry concrete, broken end plates and etc. These defect products can result in products not being able to become work in progress (WIP) or income for the company, WIP is divided into WIP 1 (products that are recognized by consumers) and WIP 2 (products that have not / are not recognized by consumers). In this study the intention was to design a pile product quality improvement and to mitigate activity risks in order to reduce the impact of product failure. Six Sigma DMAIC, namely Sub Model 1 Define, Sub Model 2 Measure, Sub Model 3 Analyze, Sub Model 4 Improvement and Sub Model 5 Control while the Risk Mitigation Model has 4 sub models that use the Risk Management approach, namely Sub Model 1 Risk Identification, Sub Model 2 Risk Analysis, Sub Model 3 Risk Evaluation and Sub Model 4 Risk Reduction. |
format |
Conference or Workshop Item |
author |
Mahardhika, Welly Iveline Anne Marie, . Surjasa, Dadang Mohd Yazid, Abu |
author_facet |
Mahardhika, Welly Iveline Anne Marie, . Surjasa, Dadang Mohd Yazid, Abu |
author_sort |
Mahardhika, Welly |
title |
Model of quality improvement and risk mitigation in the supply chain of concrete spun piles industry |
title_short |
Model of quality improvement and risk mitigation in the supply chain of concrete spun piles industry |
title_full |
Model of quality improvement and risk mitigation in the supply chain of concrete spun piles industry |
title_fullStr |
Model of quality improvement and risk mitigation in the supply chain of concrete spun piles industry |
title_full_unstemmed |
Model of quality improvement and risk mitigation in the supply chain of concrete spun piles industry |
title_sort |
model of quality improvement and risk mitigation in the supply chain of concrete spun piles industry |
publisher |
AIP Publishing |
publishDate |
2024 |
url |
http://umpir.ump.edu.my/id/eprint/43409/1/publication9.pdf http://umpir.ump.edu.my/id/eprint/43409/ https://doi.org/10.1063/5.0235717 |
_version_ |
1822924901556682752 |
score |
13.23648 |