Optimization of two-sided assembly line balancing with resource constraints using modified particle swarm optimisation
Two-Sided Assembly Line Balancing (2S-ALB) is essential to the production of large-sized high-volume products, including automotive production, at assembly plants. The 2S-ALB problem involves different assembly resources such as worker skills, tools, and machines required for the assembly. This rese...
Saved in:
Main Authors: | Muhammad Razif, Abdullah Make, Mohd Fadzil Faisae, Ab Rashid |
---|---|
Format: | Article |
Language: | English English |
Published: |
Sharif University of Technology
2022
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/42684/1/Optimization%20of%20two-sided%20assembly%20line%20balancing.pdf http://umpir.ump.edu.my/id/eprint/42684/2/Optimization%20of%20two-sided%20assembly%20line%20balancing%20with%20resource%20constraints%20using%20modified%20particle%20swarm%20optimisation_ABS.pdf http://umpir.ump.edu.my/id/eprint/42684/ https://doi.org/10.24200/sci.2020.52610.2797 https://doi.org/10.24200/sci.2020.52610.2797 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimization of two sided assembly line balancing with resource constraint
by: Muhammad Razif, Abdullah Make
Published: (2022) -
Optimisation of two-sided assembly line balancing with resource constraints using modified particle swarm optimisation
by: Muhammad Razif, Abdullah Make, et al.
Published: (2020) -
Modelling and optimization of assembly line balancing with multi-resource constraints
by: Ab Rashid, Mohd Fadzil Faisae
Published: (2013) -
Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints
by: Muhammad Razif, Abdullah Make, et al.
Published: (2016) -
Modelling and optimisation of assembly line balancing problem with resource constraint
by: Nur Hairunnisa, Kamarudin
Published: (2019)