Implication of one-way direction using schedule time at Jalan Indera Mahkota 5, Kuantan, Pahang

Beginning March 8, 2021, the public works department Jabatan Kerja Raya (JKR) Kuantan, implemented a one-way direction according to a scheduled time at Jalan Indera Mahkota 5. Observations confirmed that the one-way direction according to the scheduled time caused traffic congestion during peak hour...

Full description

Saved in:
Bibliographic Details
Main Authors: Wan Noor Hin, Mior Sani, Putra Jaya, Ramadhansyah
Format: Conference or Workshop Item
Language:English
English
Published: AIP Publishing 2024
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/42398/1/Implication%20of%20one-way%20direction%20using%20schedule%20time.pdf
http://umpir.ump.edu.my/id/eprint/42398/7/Implication%20of%20one-way%20direction%20using%20schedule%20time%20at%20Jalan%20Indera%20Mahkota%205%2C%20Kuantan.pdf
http://umpir.ump.edu.my/id/eprint/42398/
https://doi.org/10.1063/5.0217039
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.42398
record_format eprints
spelling my.ump.umpir.423982024-08-19T07:01:19Z http://umpir.ump.edu.my/id/eprint/42398/ Implication of one-way direction using schedule time at Jalan Indera Mahkota 5, Kuantan, Pahang Wan Noor Hin, Mior Sani Putra Jaya, Ramadhansyah TE Highway engineering. Roads and pavements Beginning March 8, 2021, the public works department Jabatan Kerja Raya (JKR) Kuantan, implemented a one-way direction according to a scheduled time at Jalan Indera Mahkota 5. Observations confirmed that the one-way direction according to the scheduled time caused traffic congestion during peak hours. The objective of this study is to analyze the percentage of vehicles that do not obey the one-way directions according to the scheduled time and analyze road user compliance based on responses to a questionnaire. Traffic study and questionnaire are the methods used in this study. The traffic study is divided into two categories: the total number of vehicles and the percentage of vehicles that do not obey the one-way direction at a scheduled time. The findings of this study indicate that 12% of the vehicles did not follow JKR’s instructions. The results from the questionnaires show that 80% of the respondents did not notice the signboard installed and 53% of the respondents agreed to have the road routes changed from scheduled one-way direction to full-time one-way direction. The recommendation of this study is to resize the signboard to an appropriate size so that it can be seen by road users from a sufficiently further distance. Furthermore, the statistical results of this study were provided to JKR Kuantan for further action. AIP Publishing 2024 Conference or Workshop Item PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/42398/1/Implication%20of%20one-way%20direction%20using%20schedule%20time.pdf pdf en http://umpir.ump.edu.my/id/eprint/42398/7/Implication%20of%20one-way%20direction%20using%20schedule%20time%20at%20Jalan%20Indera%20Mahkota%205%2C%20Kuantan.pdf Wan Noor Hin, Mior Sani and Putra Jaya, Ramadhansyah (2024) Implication of one-way direction using schedule time at Jalan Indera Mahkota 5, Kuantan, Pahang. In: AIP Conference Proceedings. International Conference on Sustainability Engineering Education , 24-25 Jun 2023 , Kuala Lumpur, Malaysia. pp. 1-9.. ISBN 978-0-7354-5031-8 (Published) https://doi.org/10.1063/5.0217039
institution Universiti Malaysia Pahang Al-Sultan Abdullah
building UMPSA Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang Al-Sultan Abdullah
content_source UMPSA Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
English
topic TE Highway engineering. Roads and pavements
spellingShingle TE Highway engineering. Roads and pavements
Wan Noor Hin, Mior Sani
Putra Jaya, Ramadhansyah
Implication of one-way direction using schedule time at Jalan Indera Mahkota 5, Kuantan, Pahang
description Beginning March 8, 2021, the public works department Jabatan Kerja Raya (JKR) Kuantan, implemented a one-way direction according to a scheduled time at Jalan Indera Mahkota 5. Observations confirmed that the one-way direction according to the scheduled time caused traffic congestion during peak hours. The objective of this study is to analyze the percentage of vehicles that do not obey the one-way directions according to the scheduled time and analyze road user compliance based on responses to a questionnaire. Traffic study and questionnaire are the methods used in this study. The traffic study is divided into two categories: the total number of vehicles and the percentage of vehicles that do not obey the one-way direction at a scheduled time. The findings of this study indicate that 12% of the vehicles did not follow JKR’s instructions. The results from the questionnaires show that 80% of the respondents did not notice the signboard installed and 53% of the respondents agreed to have the road routes changed from scheduled one-way direction to full-time one-way direction. The recommendation of this study is to resize the signboard to an appropriate size so that it can be seen by road users from a sufficiently further distance. Furthermore, the statistical results of this study were provided to JKR Kuantan for further action.
format Conference or Workshop Item
author Wan Noor Hin, Mior Sani
Putra Jaya, Ramadhansyah
author_facet Wan Noor Hin, Mior Sani
Putra Jaya, Ramadhansyah
author_sort Wan Noor Hin, Mior Sani
title Implication of one-way direction using schedule time at Jalan Indera Mahkota 5, Kuantan, Pahang
title_short Implication of one-way direction using schedule time at Jalan Indera Mahkota 5, Kuantan, Pahang
title_full Implication of one-way direction using schedule time at Jalan Indera Mahkota 5, Kuantan, Pahang
title_fullStr Implication of one-way direction using schedule time at Jalan Indera Mahkota 5, Kuantan, Pahang
title_full_unstemmed Implication of one-way direction using schedule time at Jalan Indera Mahkota 5, Kuantan, Pahang
title_sort implication of one-way direction using schedule time at jalan indera mahkota 5, kuantan, pahang
publisher AIP Publishing
publishDate 2024
url http://umpir.ump.edu.my/id/eprint/42398/1/Implication%20of%20one-way%20direction%20using%20schedule%20time.pdf
http://umpir.ump.edu.my/id/eprint/42398/7/Implication%20of%20one-way%20direction%20using%20schedule%20time%20at%20Jalan%20Indera%20Mahkota%205%2C%20Kuantan.pdf
http://umpir.ump.edu.my/id/eprint/42398/
https://doi.org/10.1063/5.0217039
_version_ 1822924617877028864
score 13.23243