Construction project failure: Investigating causes of ineffective building information modelling execution plans
The successful implementation of Building Information Modelling (BIM) is contingent upon effectively executing BIM Execution Plans (BEPs). This study aims to investigate the causes that contribute to the development of ineffective BEPs that ultimately result in construction project failures. Intervi...
Saved in:
Main Authors: | Mashanim, Mahazir, Rahimi, A. Rahman, Nurhaizan, Mohd Zainudin, Salmaliza, Salleh |
---|---|
Format: | Article |
Language: | English |
Published: |
Malaysian Institute of Planners
2024
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/42331/1/Construction%20project%20failure%20-%20Investigating%20causes%20of%20ineffective%20building%20information%20modelling%20execution%20plans.pdf http://umpir.ump.edu.my/id/eprint/42331/ https://doi.org/10.21837/pm.v22i32.1492 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Cause of Communication Failure in Managing Industrialized Building System (IBS) Projects: A Perspective View from Project Managers
by: Ahmad Pozin, Mohd Affendi, et al.
Published: (2018) -
Causes of abandoned construction projects in Malaysia
by: Yap, Eng Hoe
Published: (2013) -
Change order causes and control in the oil and gas construction projects
by: Mosavat, Masoumeh
Published: (2009) -
Study on causes of delay for government construction project in Kuching, Sarawak
by: Nurul Asyilah, Romzi
Published: (2017) -
Preventing enterprise resource planning failure through an enhanced approach to solve ineffective communication
by: Kabbary, Mazen Ahmed, et al.
Published: (2021)