Case study on barriers to building information modelling implementation in Malaysia

Purpose: There is a dearth of studies conducted by local academics on actual building information modelling (BIM) projects to analyse the actual hurdles of BIM adoption. The majority of BIM research focuses on the technology’s general advantages, disadvantages, issues and limitations. In addition, r...

Full description

Saved in:
Bibliographic Details
Main Authors: Munianday, Praveena, Rahimi, A. Rahman, Muneera, Esa
Format: Article
Language:English
English
Published: Emerald Publishing Limited 2023
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/40421/1/Case%20study%20on%20barriers%20to%20building%20information%20modelling%20implementation%20in%20Malaysia%20%28intro%29.pdf
http://umpir.ump.edu.my/id/eprint/40421/2/Case%20study%20on%20barriers%20to%20building%20information%20modelling%20implementation%20in%20Malaysia.pdf
http://umpir.ump.edu.my/id/eprint/40421/
http://dx.doi.org/10.1108/JFM-10-2021-0132
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.40421
record_format eprints
spelling my.ump.umpir.404212024-02-19T06:45:43Z http://umpir.ump.edu.my/id/eprint/40421/ Case study on barriers to building information modelling implementation in Malaysia Munianday, Praveena Rahimi, A. Rahman Muneera, Esa TA Engineering (General). Civil engineering (General) Purpose: There is a dearth of studies conducted by local academics on actual building information modelling (BIM) projects to analyse the actual hurdles of BIM adoption. The majority of BIM research focuses on the technology’s general advantages, disadvantages, issues and limitations. In addition, research on actual BIM projects that have integrated BIM throughout the project is necessary to increase the current low number of BIM users in Malaysia. Consequently, the purpose of this study is to examine the challenges BIM adopters experience while implementing BIM in their projects and how they overcome them. Design/methodology/approach: An in-depth interview session was used to collect data based on a case-study methodology. In Malaysia, three BIM projects were chosen, given the available resources. To evaluate the data in this qualitative study, NVivo was used. Findings: According to the findings, the most important elements influencing the adoption of new technology and innovation were people and capital. The most significant impediments to BIM adoption are the appraisal of time and finances, as well as the tolerance of changes in approach. Originality/value: Collaborative training and BIM education have been the most explored solutions for reducing BIM difficulties. As a result, these concerns and solutions should be investigated and implemented to ensure project success and fully use technological innovation. Emerald Publishing Limited 2023 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/40421/1/Case%20study%20on%20barriers%20to%20building%20information%20modelling%20implementation%20in%20Malaysia%20%28intro%29.pdf pdf en http://umpir.ump.edu.my/id/eprint/40421/2/Case%20study%20on%20barriers%20to%20building%20information%20modelling%20implementation%20in%20Malaysia.pdf Munianday, Praveena and Rahimi, A. Rahman and Muneera, Esa (2023) Case study on barriers to building information modelling implementation in Malaysia. Journal of Facilities Management, 21 (4). pp. 511-534. ISSN 1472-5967. (Published) http://dx.doi.org/10.1108/JFM-10-2021-0132 10.1108/JFM-10-2021-0132
institution Universiti Malaysia Pahang Al-Sultan Abdullah
building UMPSA Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang Al-Sultan Abdullah
content_source UMPSA Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Munianday, Praveena
Rahimi, A. Rahman
Muneera, Esa
Case study on barriers to building information modelling implementation in Malaysia
description Purpose: There is a dearth of studies conducted by local academics on actual building information modelling (BIM) projects to analyse the actual hurdles of BIM adoption. The majority of BIM research focuses on the technology’s general advantages, disadvantages, issues and limitations. In addition, research on actual BIM projects that have integrated BIM throughout the project is necessary to increase the current low number of BIM users in Malaysia. Consequently, the purpose of this study is to examine the challenges BIM adopters experience while implementing BIM in their projects and how they overcome them. Design/methodology/approach: An in-depth interview session was used to collect data based on a case-study methodology. In Malaysia, three BIM projects were chosen, given the available resources. To evaluate the data in this qualitative study, NVivo was used. Findings: According to the findings, the most important elements influencing the adoption of new technology and innovation were people and capital. The most significant impediments to BIM adoption are the appraisal of time and finances, as well as the tolerance of changes in approach. Originality/value: Collaborative training and BIM education have been the most explored solutions for reducing BIM difficulties. As a result, these concerns and solutions should be investigated and implemented to ensure project success and fully use technological innovation.
format Article
author Munianday, Praveena
Rahimi, A. Rahman
Muneera, Esa
author_facet Munianday, Praveena
Rahimi, A. Rahman
Muneera, Esa
author_sort Munianday, Praveena
title Case study on barriers to building information modelling implementation in Malaysia
title_short Case study on barriers to building information modelling implementation in Malaysia
title_full Case study on barriers to building information modelling implementation in Malaysia
title_fullStr Case study on barriers to building information modelling implementation in Malaysia
title_full_unstemmed Case study on barriers to building information modelling implementation in Malaysia
title_sort case study on barriers to building information modelling implementation in malaysia
publisher Emerald Publishing Limited
publishDate 2023
url http://umpir.ump.edu.my/id/eprint/40421/1/Case%20study%20on%20barriers%20to%20building%20information%20modelling%20implementation%20in%20Malaysia%20%28intro%29.pdf
http://umpir.ump.edu.my/id/eprint/40421/2/Case%20study%20on%20barriers%20to%20building%20information%20modelling%20implementation%20in%20Malaysia.pdf
http://umpir.ump.edu.my/id/eprint/40421/
http://dx.doi.org/10.1108/JFM-10-2021-0132
_version_ 1822924151447355392
score 13.235362