Case study on barriers to building information modelling implementation in Malaysia
Purpose: There is a dearth of studies conducted by local academics on actual building information modelling (BIM) projects to analyse the actual hurdles of BIM adoption. The majority of BIM research focuses on the technology’s general advantages, disadvantages, issues and limitations. In addition, r...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English English |
Published: |
Emerald Publishing Limited
2023
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/40421/1/Case%20study%20on%20barriers%20to%20building%20information%20modelling%20implementation%20in%20Malaysia%20%28intro%29.pdf http://umpir.ump.edu.my/id/eprint/40421/2/Case%20study%20on%20barriers%20to%20building%20information%20modelling%20implementation%20in%20Malaysia.pdf http://umpir.ump.edu.my/id/eprint/40421/ http://dx.doi.org/10.1108/JFM-10-2021-0132 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.ump.umpir.40421 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.404212024-02-19T06:45:43Z http://umpir.ump.edu.my/id/eprint/40421/ Case study on barriers to building information modelling implementation in Malaysia Munianday, Praveena Rahimi, A. Rahman Muneera, Esa TA Engineering (General). Civil engineering (General) Purpose: There is a dearth of studies conducted by local academics on actual building information modelling (BIM) projects to analyse the actual hurdles of BIM adoption. The majority of BIM research focuses on the technology’s general advantages, disadvantages, issues and limitations. In addition, research on actual BIM projects that have integrated BIM throughout the project is necessary to increase the current low number of BIM users in Malaysia. Consequently, the purpose of this study is to examine the challenges BIM adopters experience while implementing BIM in their projects and how they overcome them. Design/methodology/approach: An in-depth interview session was used to collect data based on a case-study methodology. In Malaysia, three BIM projects were chosen, given the available resources. To evaluate the data in this qualitative study, NVivo was used. Findings: According to the findings, the most important elements influencing the adoption of new technology and innovation were people and capital. The most significant impediments to BIM adoption are the appraisal of time and finances, as well as the tolerance of changes in approach. Originality/value: Collaborative training and BIM education have been the most explored solutions for reducing BIM difficulties. As a result, these concerns and solutions should be investigated and implemented to ensure project success and fully use technological innovation. Emerald Publishing Limited 2023 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/40421/1/Case%20study%20on%20barriers%20to%20building%20information%20modelling%20implementation%20in%20Malaysia%20%28intro%29.pdf pdf en http://umpir.ump.edu.my/id/eprint/40421/2/Case%20study%20on%20barriers%20to%20building%20information%20modelling%20implementation%20in%20Malaysia.pdf Munianday, Praveena and Rahimi, A. Rahman and Muneera, Esa (2023) Case study on barriers to building information modelling implementation in Malaysia. Journal of Facilities Management, 21 (4). pp. 511-534. ISSN 1472-5967. (Published) http://dx.doi.org/10.1108/JFM-10-2021-0132 10.1108/JFM-10-2021-0132 |
institution |
Universiti Malaysia Pahang Al-Sultan Abdullah |
building |
UMPSA Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang Al-Sultan Abdullah |
content_source |
UMPSA Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English English |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Munianday, Praveena Rahimi, A. Rahman Muneera, Esa Case study on barriers to building information modelling implementation in Malaysia |
description |
Purpose: There is a dearth of studies conducted by local academics on actual building information modelling (BIM) projects to analyse the actual hurdles of BIM adoption. The majority of BIM research focuses on the technology’s general advantages, disadvantages, issues and limitations. In addition, research on actual BIM projects that have integrated BIM throughout the project is necessary to increase the current low number of BIM users in Malaysia. Consequently, the purpose of this study is to examine the challenges BIM adopters experience while implementing BIM in their projects and how they overcome them.
Design/methodology/approach: An in-depth interview session was used to collect data based on a case-study methodology. In Malaysia, three BIM projects were chosen, given the available resources. To evaluate the data in this qualitative study, NVivo was used.
Findings: According to the findings, the most important elements influencing the adoption of new technology and innovation were people and capital. The most significant impediments to BIM adoption are the appraisal of time and finances, as well as the tolerance of changes in approach.
Originality/value: Collaborative training and BIM education have been the most explored solutions for reducing BIM difficulties. As a result, these concerns and solutions should be investigated and implemented to ensure project success and fully use technological innovation. |
format |
Article |
author |
Munianday, Praveena Rahimi, A. Rahman Muneera, Esa |
author_facet |
Munianday, Praveena Rahimi, A. Rahman Muneera, Esa |
author_sort |
Munianday, Praveena |
title |
Case study on barriers to building information modelling implementation in Malaysia |
title_short |
Case study on barriers to building information modelling implementation in Malaysia |
title_full |
Case study on barriers to building information modelling implementation in Malaysia |
title_fullStr |
Case study on barriers to building information modelling implementation in Malaysia |
title_full_unstemmed |
Case study on barriers to building information modelling implementation in Malaysia |
title_sort |
case study on barriers to building information modelling implementation in malaysia |
publisher |
Emerald Publishing Limited |
publishDate |
2023 |
url |
http://umpir.ump.edu.my/id/eprint/40421/1/Case%20study%20on%20barriers%20to%20building%20information%20modelling%20implementation%20in%20Malaysia%20%28intro%29.pdf http://umpir.ump.edu.my/id/eprint/40421/2/Case%20study%20on%20barriers%20to%20building%20information%20modelling%20implementation%20in%20Malaysia.pdf http://umpir.ump.edu.my/id/eprint/40421/ http://dx.doi.org/10.1108/JFM-10-2021-0132 |
_version_ |
1822924151447355392 |
score |
13.235362 |