A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects
The upward trend of dispute claims and occurrences throughout different stages has detrimentally affected the outcomes of construction projects. Building upon two major themes from a systematic literature review (SLR) study, Principal Component Analysis (PCA) was performed to further group the exten...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Malaysian Institute Of Planners
2023
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/39281/1/A%20Preliminary%20Framework%20for%20Preventing%20Disputes%20in%20Different%20Stages%20of%20Building%20Construction%20Projects.pdf http://umpir.ump.edu.my/id/eprint/39281/ https://doi.org/10.21837/pm.v21i29.1370 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.ump.umpir.39281 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.392812023-11-14T00:49:04Z http://umpir.ump.edu.my/id/eprint/39281/ A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects Nur Nadhirah, Muhammuddin Mohd Suhaimi, Mohd-Danuri Mahanim, Hanid Fadzida, Ismail Mohd Nasrun, Mohd Nawi HD28 Management. Industrial Management TH Building construction The upward trend of dispute claims and occurrences throughout different stages has detrimentally affected the outcomes of construction projects. Building upon two major themes from a systematic literature review (SLR) study, Principal Component Analysis (PCA) was performed to further group the extensive causes and strategies into several meaningful groups using the Statistical Social Package Science (SPSS) software. Questionnaires were used and issued to three main stakeholders (clients, consultants, and contractors) in the Klang Valley area. This paper presents the PCA findings, which have led to the development of a framework to prevent disputes in different stages of building construction projects. The PCA findings have narrowed down the major contributors of disputes to “Contract-related causes” and “Time-related causes”. PCA analysis has also shown that the three key themes of “Quality-related strategies,” “Business relationship-related strategies,” and “Productivity-related strategies” were the most effective ways to reduce disagreements. It is important to highlight that the findings related to the causes of disputes during the planning stage consistently align with those of a prior study. This underscores the importance of ethical conduct, particularly during the planning phase and, more specifically, within the tendering process. Malaysian Institute Of Planners 2023 Article PeerReviewed pdf en cc_by http://umpir.ump.edu.my/id/eprint/39281/1/A%20Preliminary%20Framework%20for%20Preventing%20Disputes%20in%20Different%20Stages%20of%20Building%20Construction%20Projects.pdf Nur Nadhirah, Muhammuddin and Mohd Suhaimi, Mohd-Danuri and Mahanim, Hanid and Fadzida, Ismail and Mohd Nasrun, Mohd Nawi (2023) A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects. Planning Malaysia: Journal of the Malaysian Institute of Planners, 21 (5). pp. 267-282. ISSN 0128-0945. (Published) https://doi.org/10.21837/pm.v21i29.1370 10.21837/pm.v21i29.1370 |
institution |
Universiti Malaysia Pahang Al-Sultan Abdullah |
building |
UMPSA Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang Al-Sultan Abdullah |
content_source |
UMPSA Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
HD28 Management. Industrial Management TH Building construction |
spellingShingle |
HD28 Management. Industrial Management TH Building construction Nur Nadhirah, Muhammuddin Mohd Suhaimi, Mohd-Danuri Mahanim, Hanid Fadzida, Ismail Mohd Nasrun, Mohd Nawi A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects |
description |
The upward trend of dispute claims and occurrences throughout different stages has detrimentally affected the outcomes of construction projects. Building upon two major themes from a systematic literature review (SLR) study, Principal Component Analysis (PCA) was performed to further group the extensive causes and strategies into several meaningful groups using the Statistical Social Package Science (SPSS) software. Questionnaires were used and issued to three main stakeholders (clients, consultants, and contractors) in the Klang Valley area. This paper presents the PCA findings, which have led to the development of a framework to prevent disputes in different stages of building construction projects. The PCA findings have narrowed down the major contributors of disputes to “Contract-related causes” and “Time-related causes”. PCA analysis has also shown that the three key themes of “Quality-related strategies,” “Business relationship-related strategies,” and “Productivity-related strategies” were the most effective ways to reduce disagreements. It is important to highlight that the findings related to the causes of disputes during the planning stage consistently align with those of a prior study. This underscores the importance of ethical conduct, particularly during the planning phase and, more specifically, within the tendering process. |
format |
Article |
author |
Nur Nadhirah, Muhammuddin Mohd Suhaimi, Mohd-Danuri Mahanim, Hanid Fadzida, Ismail Mohd Nasrun, Mohd Nawi |
author_facet |
Nur Nadhirah, Muhammuddin Mohd Suhaimi, Mohd-Danuri Mahanim, Hanid Fadzida, Ismail Mohd Nasrun, Mohd Nawi |
author_sort |
Nur Nadhirah, Muhammuddin |
title |
A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects |
title_short |
A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects |
title_full |
A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects |
title_fullStr |
A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects |
title_full_unstemmed |
A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects |
title_sort |
preliminary framework for preventing disputes in different stages of building construction projects |
publisher |
Malaysian Institute Of Planners |
publishDate |
2023 |
url |
http://umpir.ump.edu.my/id/eprint/39281/1/A%20Preliminary%20Framework%20for%20Preventing%20Disputes%20in%20Different%20Stages%20of%20Building%20Construction%20Projects.pdf http://umpir.ump.edu.my/id/eprint/39281/ https://doi.org/10.21837/pm.v21i29.1370 |
_version_ |
1822923852691275776 |
score |
13.235318 |