The influence of delay factors on Pahang Malaysian construction industry: A PLS-SEM approach
Previous research has shown that delay is a common problem in construction industry. Weather condition and regulation changes, though being minor factors, are also known as external factors contributing to the delay of project construction. This study involved 118 respondents from the construction...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit Universiti Malaysia Pahang
2021
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/32786/1/The%20influence%20of%20delay%20factors%20on%20Pahang.pdf http://umpir.ump.edu.my/id/eprint/32786/ https://doi.org/10.15282/ijim.11.1.2021.6120 https://doi.org/10.15282/ijim.11.1.2021.6120 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.ump.umpir.32786 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.327862021-12-08T07:49:25Z http://umpir.ump.edu.my/id/eprint/32786/ The influence of delay factors on Pahang Malaysian construction industry: A PLS-SEM approach Adeleke, A. Q. Adeniyi, A. W. Muuka, G. N. HD Industries. Land use. Labor TA Engineering (General). Civil engineering (General) Previous research has shown that delay is a common problem in construction industry. Weather condition and regulation changes, though being minor factors, are also known as external factors contributing to the delay of project construction. This study involved 118 respondents from the construction industry in Kuantan, Pahang. In order to obtain the data, copies of questionnaire were distributed widely among people in Pahang construction industry. The data were analysed by using Partial Least Squares Structural Equation Modelling version 3. A significant positive relationship between weather conditions and building projects in Pahang construction industry was identified. This study also found a negative relationship between regulation changes and building projects in Pahang construction industry. As expected, weather conditions were found to be one of the factors contributing to delay in the process of projects’ construction in Malaysia. However, weather conditions and the regulation changes did not significantly affect the construction projects in Malaysia. Out of the factors which contributed to delay in building projects, weather conditions, though a minor factor, played to an extent a part in contributing to extension of the time of the projects in Malaysia. Nevertheless, regulation changes was not considered a vital factor leading to delay in building projects in Malaysia. Penerbit Universiti Malaysia Pahang 2021-08-31 Article PeerReviewed pdf en cc_by_4 http://umpir.ump.edu.my/id/eprint/32786/1/The%20influence%20of%20delay%20factors%20on%20Pahang.pdf Adeleke, A. Q. and Adeniyi, A. W. and Muuka, G. N. (2021) The influence of delay factors on Pahang Malaysian construction industry: A PLS-SEM approach. International Journal of Industrial Management (IJIM), 11 (1). 206 -216. ISSN 2289-9286 (Print); 0127-564x (Online) https://doi.org/10.15282/ijim.11.1.2021.6120 https://doi.org/10.15282/ijim.11.1.2021.6120 |
institution |
Universiti Malaysia Pahang |
building |
UMP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang |
content_source |
UMP Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
HD Industries. Land use. Labor TA Engineering (General). Civil engineering (General) |
spellingShingle |
HD Industries. Land use. Labor TA Engineering (General). Civil engineering (General) Adeleke, A. Q. Adeniyi, A. W. Muuka, G. N. The influence of delay factors on Pahang Malaysian construction industry: A PLS-SEM approach |
description |
Previous research has shown that delay is a common problem in construction industry. Weather condition and regulation changes, though being minor factors, are also known as external factors contributing to the delay of project construction. This study involved 118 respondents from the construction industry in Kuantan, Pahang. In order to obtain the data, copies of questionnaire were distributed widely among people in Pahang construction industry. The data were analysed by using Partial Least Squares Structural Equation Modelling version 3. A significant positive relationship between weather conditions and building projects in Pahang construction industry was identified. This study also found a negative relationship between regulation changes and building projects in Pahang construction industry. As expected, weather conditions were found to be one of the factors contributing to delay in the process of projects’ construction in Malaysia. However, weather conditions and the regulation changes did not significantly affect the construction projects in Malaysia. Out of the factors which contributed to delay in building projects, weather conditions, though a minor factor, played to an extent a part in contributing to extension of the time of the projects in Malaysia. Nevertheless, regulation changes was not considered a vital factor leading to delay in building projects in Malaysia. |
format |
Article |
author |
Adeleke, A. Q. Adeniyi, A. W. Muuka, G. N. |
author_facet |
Adeleke, A. Q. Adeniyi, A. W. Muuka, G. N. |
author_sort |
Adeleke, A. Q. |
title |
The influence of delay factors on Pahang Malaysian construction industry: A PLS-SEM approach |
title_short |
The influence of delay factors on Pahang Malaysian construction industry: A PLS-SEM approach |
title_full |
The influence of delay factors on Pahang Malaysian construction industry: A PLS-SEM approach |
title_fullStr |
The influence of delay factors on Pahang Malaysian construction industry: A PLS-SEM approach |
title_full_unstemmed |
The influence of delay factors on Pahang Malaysian construction industry: A PLS-SEM approach |
title_sort |
influence of delay factors on pahang malaysian construction industry: a pls-sem approach |
publisher |
Penerbit Universiti Malaysia Pahang |
publishDate |
2021 |
url |
http://umpir.ump.edu.my/id/eprint/32786/1/The%20influence%20of%20delay%20factors%20on%20Pahang.pdf http://umpir.ump.edu.my/id/eprint/32786/ https://doi.org/10.15282/ijim.11.1.2021.6120 https://doi.org/10.15282/ijim.11.1.2021.6120 |
_version_ |
1718926265047580672 |
score |
13.222552 |