Modelling of heuristic distribution algorithm to optimize flexible production scheduling in Indian industry
Multi-objective scheduling with the NP-dependent relay preparation time becomes difficult because the complexity of the optimization increases within a reasonable time. Research methods have become a more important option to solve the difficult problems of NP because there are more powerful solution...
محفوظ في:
المؤلفون الرئيسيون: | Reddy, Guduru Ramakrishna, Singh, Harpreet, Domeika, Aurelijus, Manoj Kumar, Nallapaneni, Quanjin, Ma |
---|---|
التنسيق: | Conference or Workshop Item |
اللغة: | English |
منشور في: |
Elsevier
2020
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://umpir.ump.edu.my/id/eprint/30093/1/Modelling%20of%20heuristic%20distribution%20algorithm%20to%20optimize%20flexible.pdf http://umpir.ump.edu.my/id/eprint/30093/ https://doi.org/10.1016/j.procs.2020.03.414 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Recent 3D and 4D intelligent printing technologies: A comparative review and future perspective
بواسطة: Ma, Quanjin, وآخرون
منشور في: (2020) -
Bottleneck-based heuristic for three-machine flow shop scheduling
بواسطة: Abdul Rahim, Mohd Salleh
منشور في: (2011) -
Advanced composite sandwich structure design for energy absorption applications: blast protection and crashworthiness
بواسطة: Tarlochan, F., وآخرون
منشور في: (2012) -
A review of assembly line balancing optimisation with energy consideration using meta-heuristic algorithms
بواسطة: Mohd Fadzil Faisae, Ab Rashid, وآخرون
منشور في: (2021) -
Design of cooling channel in hot stamping tool by heuristic approach
بواسطة: Mohd Fawzi, Zamri
منشور في: (2017)