Modelling of heuristic distribution algorithm to optimize flexible production scheduling in Indian industry
Multi-objective scheduling with the NP-dependent relay preparation time becomes difficult because the complexity of the optimization increases within a reasonable time. Research methods have become a more important option to solve the difficult problems of NP because there are more powerful solution...
Saved in:
Main Authors: | Reddy, Guduru Ramakrishna, Singh, Harpreet, Domeika, Aurelijus, Manoj Kumar, Nallapaneni, Quanjin, Ma |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
Elsevier
2020
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/30093/1/Modelling%20of%20heuristic%20distribution%20algorithm%20to%20optimize%20flexible.pdf http://umpir.ump.edu.my/id/eprint/30093/ https://doi.org/10.1016/j.procs.2020.03.414 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Recent 3D and 4D intelligent printing technologies: A comparative review and future perspective
by: Ma, Quanjin, et al.
Published: (2020) -
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011) -
Advanced composite sandwich structure design for energy absorption applications: blast protection and crashworthiness
by: Tarlochan, F., et al.
Published: (2012) -
A review of assembly line balancing optimisation with energy consideration using meta-heuristic algorithms
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2021) -
Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry
by: Muhammad Razif, Abdullah Make, et al.
Published: (2017)