Assessment of construction planning of new project : Medan Ikan Bakar case study

A construction project is commonly acknowledged as successful when it is completed on time, within budget, in accordance with specifications and to stakeholder satisfaction. During the project execution, delay in the project is one of the failures that usually occurred in the construction industry,...

Full description

Saved in:
Bibliographic Details
Main Author: Siti Farahanum, Ab Rahim
Format: Undergraduates Project Papers
Language:English
Published: 2018
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/29519/1/06.Assessment%20of%20construction%20planning%20of%20new%20project.pdf
http://umpir.ump.edu.my/id/eprint/29519/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.29519
record_format eprints
spelling my.ump.umpir.295192023-04-27T03:52:40Z http://umpir.ump.edu.my/id/eprint/29519/ Assessment of construction planning of new project : Medan Ikan Bakar case study Siti Farahanum, Ab Rahim TA Engineering (General). Civil engineering (General) TH Building construction A construction project is commonly acknowledged as successful when it is completed on time, within budget, in accordance with specifications and to stakeholder satisfaction. During the project execution, delay in the project is one of the failures that usually occurred in the construction industry, which leads to extension of time where the project cannot be completed according to the plan. The objective of this study was focused on assessment of construction planning of new project Medan Ikan Bakar. The existing plan of the Medan Ikan Bakar project is analysed and it has been identified that the delay was occurred during the project execution. Due to the extension of time that occurred in the project, the reschedule plan of the Medan Ikan Bakar project is carried out by considering the number of rainy days and the public holidays. Hence, the optimum working days is obtained and the project could be completed according to the plan so that the users may not face the lost in the term of the operation of the building where the completed project is beyond the expected date. After acquiring the optimum working days in construction planning, several suggestions could be created for the development of strategies with the purpose in improving construction planning practices and can be as a guideline for future study in planning the construction project. 2018-06 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/29519/1/06.Assessment%20of%20construction%20planning%20of%20new%20project.pdf Siti Farahanum, Ab Rahim (2018) Assessment of construction planning of new project : Medan Ikan Bakar case study. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TA Engineering (General). Civil engineering (General)
TH Building construction
spellingShingle TA Engineering (General). Civil engineering (General)
TH Building construction
Siti Farahanum, Ab Rahim
Assessment of construction planning of new project : Medan Ikan Bakar case study
description A construction project is commonly acknowledged as successful when it is completed on time, within budget, in accordance with specifications and to stakeholder satisfaction. During the project execution, delay in the project is one of the failures that usually occurred in the construction industry, which leads to extension of time where the project cannot be completed according to the plan. The objective of this study was focused on assessment of construction planning of new project Medan Ikan Bakar. The existing plan of the Medan Ikan Bakar project is analysed and it has been identified that the delay was occurred during the project execution. Due to the extension of time that occurred in the project, the reschedule plan of the Medan Ikan Bakar project is carried out by considering the number of rainy days and the public holidays. Hence, the optimum working days is obtained and the project could be completed according to the plan so that the users may not face the lost in the term of the operation of the building where the completed project is beyond the expected date. After acquiring the optimum working days in construction planning, several suggestions could be created for the development of strategies with the purpose in improving construction planning practices and can be as a guideline for future study in planning the construction project.
format Undergraduates Project Papers
author Siti Farahanum, Ab Rahim
author_facet Siti Farahanum, Ab Rahim
author_sort Siti Farahanum, Ab Rahim
title Assessment of construction planning of new project : Medan Ikan Bakar case study
title_short Assessment of construction planning of new project : Medan Ikan Bakar case study
title_full Assessment of construction planning of new project : Medan Ikan Bakar case study
title_fullStr Assessment of construction planning of new project : Medan Ikan Bakar case study
title_full_unstemmed Assessment of construction planning of new project : Medan Ikan Bakar case study
title_sort assessment of construction planning of new project : medan ikan bakar case study
publishDate 2018
url http://umpir.ump.edu.my/id/eprint/29519/1/06.Assessment%20of%20construction%20planning%20of%20new%20project.pdf
http://umpir.ump.edu.my/id/eprint/29519/
_version_ 1765296910365622272
score 13.211869