Requirement prioritization based on non-functional requirement classification using hierarchy AHP
Requirement prioritization is a process in requirement engineering, which is a part of software development life cycle (SDLC). Requirement is prioritized due to constraints such as budget, time and resource allocation. Requirements of software is often classified as functional requirements (FR), and...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English English |
Published: |
IOP Publishing
2020
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/28001/1/Requirement%20Prioritization%20Based%20on%20Non-Functional%20Requirement%20Classification%20Using%20Hierarchy%20AHP.pdf http://umpir.ump.edu.my/id/eprint/28001/2/Requirement%20Prioritization%20Based%20on%20Non-Functional%20Requirement%20Classification%20Using%20Hierarchy%20AHP.pdf http://umpir.ump.edu.my/id/eprint/28001/ https://doi.org/10.1088/1757-899X/769/1/012060 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Internet
http://umpir.ump.edu.my/id/eprint/28001/1/Requirement%20Prioritization%20Based%20on%20Non-Functional%20Requirement%20Classification%20Using%20Hierarchy%20AHP.pdfhttp://umpir.ump.edu.my/id/eprint/28001/2/Requirement%20Prioritization%20Based%20on%20Non-Functional%20Requirement%20Classification%20Using%20Hierarchy%20AHP.pdf
http://umpir.ump.edu.my/id/eprint/28001/
https://doi.org/10.1088/1757-899X/769/1/012060