The impact of weather condition to construction project in Malaysia

Weather conditions in Malaysia are the cause of delay in construction project and affect parties involved with period and cost problems. Due to uncertain weather and severe impact on all construction activities that will be limited by losses that may be attributable to reduced labor productivity due...

Full description

Saved in:
Bibliographic Details
Main Author: Nur Shahirah, Abu Hassan Asaari
Format: Undergraduates Project Papers
Language:English
Published: 2018
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/27596/1/The%20impact%20of%20weather%20condition%20to%20construction%20project.pdf
http://umpir.ump.edu.my/id/eprint/27596/
https://efind.ump.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=90898
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.27596
record_format eprints
spelling my.ump.umpir.275962020-01-30T03:15:20Z http://umpir.ump.edu.my/id/eprint/27596/ The impact of weather condition to construction project in Malaysia Nur Shahirah, Abu Hassan Asaari TA Engineering (General). Civil engineering (General) TH Building construction Weather conditions in Malaysia are the cause of delay in construction project and affect parties involved with period and cost problems. Due to uncertain weather and severe impact on all construction activities that will be limited by losses that may be attributable to reduced labor productivity due to interruption of an activity. Weather conditions that can be linked are rain, heat and extreme winds condition as Malaysia is known as a hot and humid throughout all year. Delayed by weather can be mitigated when impacts and means of overcoming during construction are identified. The objective of this study is to identify the main effects of the weather affecting the delay in the construction project and the way it is used to solve the problem. This study is based on literature review and information collection through surveys. From the survey, this study presents the results of the study to determine and assess the major effects of the cause of the delay caused by the weather and the way they handle it. This survey is distributed to contractors, consultants, owners who are randomly assigned. Relative importance index (RII) is used to create average scores and ranking for analysis and conclusions. The direct and indirect effects of weather events on logistics, areas, processes or productivity, employees and finances are discussed in detail. Direct and indirect effects of weather and climate change include damage to equipment and areas due to higher temperatures and increased rainfall, with delayed costs and increased cost to the project. 2018-06 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/27596/1/The%20impact%20of%20weather%20condition%20to%20construction%20project.pdf Nur Shahirah, Abu Hassan Asaari (2018) The impact of weather condition to construction project in Malaysia. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang. https://efind.ump.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=90898
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TA Engineering (General). Civil engineering (General)
TH Building construction
spellingShingle TA Engineering (General). Civil engineering (General)
TH Building construction
Nur Shahirah, Abu Hassan Asaari
The impact of weather condition to construction project in Malaysia
description Weather conditions in Malaysia are the cause of delay in construction project and affect parties involved with period and cost problems. Due to uncertain weather and severe impact on all construction activities that will be limited by losses that may be attributable to reduced labor productivity due to interruption of an activity. Weather conditions that can be linked are rain, heat and extreme winds condition as Malaysia is known as a hot and humid throughout all year. Delayed by weather can be mitigated when impacts and means of overcoming during construction are identified. The objective of this study is to identify the main effects of the weather affecting the delay in the construction project and the way it is used to solve the problem. This study is based on literature review and information collection through surveys. From the survey, this study presents the results of the study to determine and assess the major effects of the cause of the delay caused by the weather and the way they handle it. This survey is distributed to contractors, consultants, owners who are randomly assigned. Relative importance index (RII) is used to create average scores and ranking for analysis and conclusions. The direct and indirect effects of weather events on logistics, areas, processes or productivity, employees and finances are discussed in detail. Direct and indirect effects of weather and climate change include damage to equipment and areas due to higher temperatures and increased rainfall, with delayed costs and increased cost to the project.
format Undergraduates Project Papers
author Nur Shahirah, Abu Hassan Asaari
author_facet Nur Shahirah, Abu Hassan Asaari
author_sort Nur Shahirah, Abu Hassan Asaari
title The impact of weather condition to construction project in Malaysia
title_short The impact of weather condition to construction project in Malaysia
title_full The impact of weather condition to construction project in Malaysia
title_fullStr The impact of weather condition to construction project in Malaysia
title_full_unstemmed The impact of weather condition to construction project in Malaysia
title_sort impact of weather condition to construction project in malaysia
publishDate 2018
url http://umpir.ump.edu.my/id/eprint/27596/1/The%20impact%20of%20weather%20condition%20to%20construction%20project.pdf
http://umpir.ump.edu.my/id/eprint/27596/
https://efind.ump.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=90898
_version_ 1657487855539191808
score 13.211869