Proposing of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing on Magnetic Component of Electrical & Electronic Industry
In the complex and dynamic environment today, it is very important for Electrical & Electronic (E&E) industry to know the better quality and profitability of magnetic component. The objective of this work is proposing of Mahalanobis-Taguchi System (MTS) and Time-Driven Activity-Based Costing...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
Springer
2020
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/26240/1/Proposing%20of%20Mahalanobis-Taguchi%20System%20and%20Time-Driven%20Activity1.pdf http://umpir.ump.edu.my/id/eprint/26240/ https://doi.org/10.1007/978-981-15-0950-6_17 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.ump.umpir.26240 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.262402019-10-30T07:07:16Z http://umpir.ump.edu.my/id/eprint/26240/ Proposing of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing on Magnetic Component of Electrical & Electronic Industry Nik Nurharyantie, Nik Mohd Kamil Mohd Yazid, Abu Nurul Farahin, Zamrud Filzah Lina, Mohd Safeiee TS Manufactures In the complex and dynamic environment today, it is very important for Electrical & Electronic (E&E) industry to know the better quality and profitability of magnetic component. The objective of this work is proposing of Mahalanobis-Taguchi System (MTS) and Time-Driven Activity-Based Costing (TDABC) on production of E&E industry. In general, MTS is used to evaluates the parameters in workstation either critical or non-critical parameter while TDABC requires estimate two key parameters: (1) develop time equation to determine the estimated time for each activity and (2) calculate capacity cost rate of each sub-activity. Furthermore, based on collecting the data for a workstation visual mechanical inspection, MTS can identify the diagnosis parameters while TDABC can measure the unused capacity in term of resources and time for each process in a workstation. Eventually, MTS found that Mahalanobis Distance (MD), 7 and TDABC predicted MYR62659.55. Springer 2020 Conference or Workshop Item PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/26240/1/Proposing%20of%20Mahalanobis-Taguchi%20System%20and%20Time-Driven%20Activity1.pdf Nik Nurharyantie, Nik Mohd Kamil and Mohd Yazid, Abu and Nurul Farahin, Zamrud and Filzah Lina, Mohd Safeiee (2020) Proposing of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing on Magnetic Component of Electrical & Electronic Industry. In: iMEC-APCOMS 2019: Proceedings of the 4th International Manufacturing Engineering Conference and The 5th Asia Pacific Conference on Manufacturing Systems, 21-22 August 2019 , Putrajaya, Malaysia. pp. 108-114.. ISBN 978-981-15-0950-6 https://doi.org/10.1007/978-981-15-0950-6_17 |
institution |
Universiti Malaysia Pahang |
building |
UMP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang |
content_source |
UMP Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
TS Manufactures |
spellingShingle |
TS Manufactures Nik Nurharyantie, Nik Mohd Kamil Mohd Yazid, Abu Nurul Farahin, Zamrud Filzah Lina, Mohd Safeiee Proposing of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing on Magnetic Component of Electrical & Electronic Industry |
description |
In the complex and dynamic environment today, it is very important for Electrical & Electronic (E&E) industry to know the better quality and profitability of magnetic component. The objective of this work is proposing of Mahalanobis-Taguchi System (MTS) and Time-Driven Activity-Based Costing (TDABC) on production of E&E industry. In general, MTS is used to evaluates the parameters in workstation either critical or non-critical parameter while TDABC requires estimate two key parameters: (1) develop time equation to determine the estimated time for each activity and (2) calculate capacity cost rate of each sub-activity. Furthermore, based on collecting the data for a workstation visual mechanical inspection, MTS can identify the diagnosis parameters while TDABC can measure the unused capacity in term of resources and time for each process in a workstation. Eventually, MTS found that Mahalanobis Distance (MD), 7 and TDABC predicted MYR62659.55. |
format |
Conference or Workshop Item |
author |
Nik Nurharyantie, Nik Mohd Kamil Mohd Yazid, Abu Nurul Farahin, Zamrud Filzah Lina, Mohd Safeiee |
author_facet |
Nik Nurharyantie, Nik Mohd Kamil Mohd Yazid, Abu Nurul Farahin, Zamrud Filzah Lina, Mohd Safeiee |
author_sort |
Nik Nurharyantie, Nik Mohd Kamil |
title |
Proposing of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing on Magnetic Component of Electrical & Electronic Industry |
title_short |
Proposing of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing on Magnetic Component of Electrical & Electronic Industry |
title_full |
Proposing of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing on Magnetic Component of Electrical & Electronic Industry |
title_fullStr |
Proposing of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing on Magnetic Component of Electrical & Electronic Industry |
title_full_unstemmed |
Proposing of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing on Magnetic Component of Electrical & Electronic Industry |
title_sort |
proposing of mahalanobis-taguchi system and time-driven activity-based costing on magnetic component of electrical & electronic industry |
publisher |
Springer |
publishDate |
2020 |
url |
http://umpir.ump.edu.my/id/eprint/26240/1/Proposing%20of%20Mahalanobis-Taguchi%20System%20and%20Time-Driven%20Activity1.pdf http://umpir.ump.edu.my/id/eprint/26240/ https://doi.org/10.1007/978-981-15-0950-6_17 |
_version_ |
1651866952943009792 |
score |
13.211869 |