Risk assessment for demoliition works in Malaysia

This research is aimed at developing an overview as well as assessing the potential hazard involve in demolition operations in Malaysia. It intends to generate perspective insight into the current state of demolition works which in turn, will be beneficially applied to serve as a solid platform for...

Full description

Saved in:
Bibliographic Details
Main Author: Nor Rizman, Abas
Format: Undergraduates Project Papers
Language:English
Published: 2010
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/2538/1/NOR_RIZMAN_BIN_ABAS.PDF
http://umpir.ump.edu.my/id/eprint/2538/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.2538
record_format eprints
spelling my.ump.umpir.25382021-06-24T07:07:25Z http://umpir.ump.edu.my/id/eprint/2538/ Risk assessment for demoliition works in Malaysia Nor Rizman, Abas TH Building construction This research is aimed at developing an overview as well as assessing the potential hazard involve in demolition operations in Malaysia. It intends to generate perspective insight into the current state of demolition works which in turn, will be beneficially applied to serve as a solid platform for future research and development. This research is divided into three parts. The first part involves the case study of two demolition project that has been carried out which is Lumba Kuda Flats in Johor Babru and Pekeliling Flats in Kuala Lumpur. Both of the case studies have shown -that although risk management was included in the health and safety plan, it only covers the surface of the problem area by only referring to Factories and Machinery Act 1974, Occupational Safety and Health Act 1994 or base on previous project report. The second part of the research is discussion with expert regarding the problems in managing hazards on site. The last part involves the development of the risk assessment system and the implementation of the findings which covers the hazard identification process and risk management for demolition works at UTMKL that suppose to commence on February 2008. However, the project has been postponed to further date that has not, been stated up till now. After taking few factors into consideration, the research has been proceed by making an assumption that the traditional method (deconstruction) will be adopted. Hence, the hazard identification process as well as the control measures involve has been identified. The hazard and control measures involve has been stated in risk assessment form that has been developed. The development of the risk assessment form shows that all the objectives for the research has been achieve. The conclusion that can be drawn is the types of hazard that may be arise on site is depends on the activity during the execution of the demolition project. 2010-11 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/2538/1/NOR_RIZMAN_BIN_ABAS.PDF Nor Rizman, Abas (2010) Risk assessment for demoliition works in Malaysia. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang .
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Nor Rizman, Abas
Risk assessment for demoliition works in Malaysia
description This research is aimed at developing an overview as well as assessing the potential hazard involve in demolition operations in Malaysia. It intends to generate perspective insight into the current state of demolition works which in turn, will be beneficially applied to serve as a solid platform for future research and development. This research is divided into three parts. The first part involves the case study of two demolition project that has been carried out which is Lumba Kuda Flats in Johor Babru and Pekeliling Flats in Kuala Lumpur. Both of the case studies have shown -that although risk management was included in the health and safety plan, it only covers the surface of the problem area by only referring to Factories and Machinery Act 1974, Occupational Safety and Health Act 1994 or base on previous project report. The second part of the research is discussion with expert regarding the problems in managing hazards on site. The last part involves the development of the risk assessment system and the implementation of the findings which covers the hazard identification process and risk management for demolition works at UTMKL that suppose to commence on February 2008. However, the project has been postponed to further date that has not, been stated up till now. After taking few factors into consideration, the research has been proceed by making an assumption that the traditional method (deconstruction) will be adopted. Hence, the hazard identification process as well as the control measures involve has been identified. The hazard and control measures involve has been stated in risk assessment form that has been developed. The development of the risk assessment form shows that all the objectives for the research has been achieve. The conclusion that can be drawn is the types of hazard that may be arise on site is depends on the activity during the execution of the demolition project.
format Undergraduates Project Papers
author Nor Rizman, Abas
author_facet Nor Rizman, Abas
author_sort Nor Rizman, Abas
title Risk assessment for demoliition works in Malaysia
title_short Risk assessment for demoliition works in Malaysia
title_full Risk assessment for demoliition works in Malaysia
title_fullStr Risk assessment for demoliition works in Malaysia
title_full_unstemmed Risk assessment for demoliition works in Malaysia
title_sort risk assessment for demoliition works in malaysia
publishDate 2010
url http://umpir.ump.edu.my/id/eprint/2538/1/NOR_RIZMAN_BIN_ABAS.PDF
http://umpir.ump.edu.my/id/eprint/2538/
_version_ 1703960704074121216
score 13.211869