Traffic management during construction: case study of flyover at Jalan Bukit Ubi, Kuantan
Managing traffic at the construction area is the crucial part without having risks to health and safety whether it is in short or long term duration. Traffic management includes all physical measures designed to affect the movement of traffic on an existing network including the volume of traffic an...
Saved in:
Main Author: | Sharmaine, Shaari |
---|---|
Format: | Undergraduates Project Papers |
Language: | English English English English |
Published: |
2017
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/20961/1/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-Table%20of%20contents.pdf http://umpir.ump.edu.my/id/eprint/20961/7/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-Abstract.pdf http://umpir.ump.edu.my/id/eprint/20961/13/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-Chapter%201.pdf http://umpir.ump.edu.my/id/eprint/20961/19/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-References.pdf http://umpir.ump.edu.my/id/eprint/20961/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Case study: congestion at traffic signal of junction Jalan Bukit Ubi and Jalan Dato Lim Hoe Lek
by: Muhammad , Ali
Published: (2013) -
Unused Cyberjaya flyover collapses
by: Guang Ming, Daily
Published: (2013) -
Effect of traffic volume and shoulder width towards crash cases at jalan Kuantan bypass
by: Norazlina, Ahmad Tajuddin
Published: (2018) -
Assesment of construction planning : maintenance of piping system at Bukit Sekilau Kuantan case study
by: Nur Syazana, Jusoh
Published: (2018) -
Supply Chain Management in Flyover Projects in India
by: Yadav, Sudhir, et al.
Published: (2015)