Case on Delivery Performance Improvement

The objective of this case study is to improve lead time delivery of spare parts from Distributor Center (DC) to TTT Sdn. Bhd. (TTT) warehouse which is located at Kemaman, Terengganu before deliver to end user within Kemaman area.

Saved in:
Bibliographic Details
Main Author: Tengku Hasanul, Firdaus
Other Authors: Sorooshian, Shahryar
Format: Book Section
Language:English
Published: Penerbit UMP 2017
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/19064/1/fim-2017-hasanul-Case%20on%20Delivery%20Performance%20Improvement.pdf
http://umpir.ump.edu.my/id/eprint/19064/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.19064
record_format eprints
spelling my.ump.umpir.190642017-11-15T00:57:50Z http://umpir.ump.edu.my/id/eprint/19064/ Case on Delivery Performance Improvement Tengku Hasanul, Firdaus HD28 Management. Industrial Management The objective of this case study is to improve lead time delivery of spare parts from Distributor Center (DC) to TTT Sdn. Bhd. (TTT) warehouse which is located at Kemaman, Terengganu before deliver to end user within Kemaman area. Penerbit UMP Sorooshian, Shahryar 2017 Book Section PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/19064/1/fim-2017-hasanul-Case%20on%20Delivery%20Performance%20Improvement.pdf Tengku Hasanul, Firdaus (2017) Case on Delivery Performance Improvement. In: Collection of Teaching Cases for Business Administration Studies. Penerbit UMP, Kuantan, Pahang, pp. 6-10. ISBN 978-967-2054-50-4
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Tengku Hasanul, Firdaus
Case on Delivery Performance Improvement
description The objective of this case study is to improve lead time delivery of spare parts from Distributor Center (DC) to TTT Sdn. Bhd. (TTT) warehouse which is located at Kemaman, Terengganu before deliver to end user within Kemaman area.
author2 Sorooshian, Shahryar
author_facet Sorooshian, Shahryar
Tengku Hasanul, Firdaus
format Book Section
author Tengku Hasanul, Firdaus
author_sort Tengku Hasanul, Firdaus
title Case on Delivery Performance Improvement
title_short Case on Delivery Performance Improvement
title_full Case on Delivery Performance Improvement
title_fullStr Case on Delivery Performance Improvement
title_full_unstemmed Case on Delivery Performance Improvement
title_sort case on delivery performance improvement
publisher Penerbit UMP
publishDate 2017
url http://umpir.ump.edu.my/id/eprint/19064/1/fim-2017-hasanul-Case%20on%20Delivery%20Performance%20Improvement.pdf
http://umpir.ump.edu.my/id/eprint/19064/
_version_ 1643668595239026688
score 13.211869