Effective project management based on performance index

The problem of delays in the construction industry is a global phenomenon and the construction industry . the goal of all parties involved in construction projects- clients, Project Manager, Engineering Consulatants and Contractors in either the public or private sector is to successfully complete t...

Full description

Saved in:
Bibliographic Details
Main Author: Siti Syafinah Amirah, Salleh
Format: Undergraduates Project Papers
Language:English
Published: 2017
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/18225/1/Effective%20project%20management%20based%20on%20performance%20index.pdf
http://umpir.ump.edu.my/id/eprint/18225/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.18225
record_format eprints
spelling my.ump.umpir.182252022-12-19T08:54:15Z http://umpir.ump.edu.my/id/eprint/18225/ Effective project management based on performance index Siti Syafinah Amirah, Salleh TA Engineering (General). Civil engineering (General) The problem of delays in the construction industry is a global phenomenon and the construction industry . the goal of all parties involved in construction projects- clients, Project Manager, Engineering Consulatants and Contractors in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Constrcution projects are frequently influenced by either success indicators that help project parties reach their goal as planned, or delay indicators that stfle or postpone project completion. The prupose of this research is to identify success and delay indicators which can help project parties reach their intended goals with greater efficiency. This research extracted six of the most important success indicators according to the literature and six of the most important delay indicators identified by project parties, and then examined correlations between them to determine which were the most influentiatl in preventing project delays. This research uses a comrehensive literature review to design and conduct a survey to investigate success and delay indicators. A specific survey was contributer to contractors, client, project manager and engineering consultants to examine the most causes delay indicators. A general survey was distributed to examine the correlation between the identified delay indicators and the six most important causes success indicators selected. A consensus of expert opinion using the statistical methos to rank the most needed causes of success indicators for consturction industry especially for the example of project at Cyberjaya. 2017-01 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/18225/1/Effective%20project%20management%20based%20on%20performance%20index.pdf Siti Syafinah Amirah, Salleh (2017) Effective project management based on performance index. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Siti Syafinah Amirah, Salleh
Effective project management based on performance index
description The problem of delays in the construction industry is a global phenomenon and the construction industry . the goal of all parties involved in construction projects- clients, Project Manager, Engineering Consulatants and Contractors in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Constrcution projects are frequently influenced by either success indicators that help project parties reach their goal as planned, or delay indicators that stfle or postpone project completion. The prupose of this research is to identify success and delay indicators which can help project parties reach their intended goals with greater efficiency. This research extracted six of the most important success indicators according to the literature and six of the most important delay indicators identified by project parties, and then examined correlations between them to determine which were the most influentiatl in preventing project delays. This research uses a comrehensive literature review to design and conduct a survey to investigate success and delay indicators. A specific survey was contributer to contractors, client, project manager and engineering consultants to examine the most causes delay indicators. A general survey was distributed to examine the correlation between the identified delay indicators and the six most important causes success indicators selected. A consensus of expert opinion using the statistical methos to rank the most needed causes of success indicators for consturction industry especially for the example of project at Cyberjaya.
format Undergraduates Project Papers
author Siti Syafinah Amirah, Salleh
author_facet Siti Syafinah Amirah, Salleh
author_sort Siti Syafinah Amirah, Salleh
title Effective project management based on performance index
title_short Effective project management based on performance index
title_full Effective project management based on performance index
title_fullStr Effective project management based on performance index
title_full_unstemmed Effective project management based on performance index
title_sort effective project management based on performance index
publishDate 2017
url http://umpir.ump.edu.my/id/eprint/18225/1/Effective%20project%20management%20based%20on%20performance%20index.pdf
http://umpir.ump.edu.my/id/eprint/18225/
_version_ 1753788548379574272
score 13.211869