Standardized work approach toward kaizen event of the Front Hub MyVi D54T line at Sapura Machining Corporation Sdn Bhd
This thesis is deal with the one of the lean production system tool which is standardized work to eliminate the waste at the production line for continuous improvement. Standardized work is conducted to design, developing, and documentation and visualizes the proper and detail manufacturing process....
Saved in:
Main Author: | |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/16205/1/Standardized%20work%20approach%20toward%20kaizen%20event%20of%20the%20Front%20Hub%20MyVi%20D54T%20line%20at%20Sapura%20Machining%20Corporation%20Sdn%20Bhd-CD%2010429.pdf http://umpir.ump.edu.my/id/eprint/16205/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|