Adoptation of engine for smaller enterprise (E4SE) performance measurement system (PMS) in small project based company in Malaysia

This research was conducted to test the validity of the new performance measurement system which is the Engine For Smaller Enterprise, E4SE model and make the recommendation implementation of the E4SE model in the small project based companies in the SMEs industry. The performance measurement system...

Full description

Saved in:
Bibliographic Details
Main Author: Lim, Pei Jiun
Format: Undergraduates Project Papers
Language:English
Published: 2016
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/15954/1/05.Adoptation%20of%20engine%20for%20smaller%20enterprise%20%28E4SE%29%20performance%20measurement%20system%20%28PMS%29%20in%20small%20project%20based%20company%20in%20Malaysia.pdf
http://umpir.ump.edu.my/id/eprint/15954/
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first