Composing of Lead Time Reduction Approach in Assembling an Electrical Product
The paper explores the lead time reduction projects that have been implemented in an electrical product assembly line, called subwoofer speaker. Observation has been conducted on 26 workstations which are involved in an assembly line. Group discussion, real-time study, and action research hav...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English English |
Published: |
Penerbit Universiti Malaysia Pahang
2016
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/13927/1/ftech-2016-abdullah-Composing%20of%20Lead%20Time%20Reduction%20Approach.pdf http://umpir.ump.edu.my/id/eprint/13927/7/ftech-2016-abdullah-Composing%20of%20Lead%20Time%20Reduction.pdf http://umpir.ump.edu.my/id/eprint/13927/ http://ijim.ump.edu.my/images/IJIM-2/27-39.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!