Fabrication of a test bed for performance testing of Unmanned Aerial Vehicle (UAV) propulsion system
This project report has been conducted because of the Unmanned Aerial Vehicle (UAV) power plant development performance testing (static test) facilities is not fully deployed. The main purpose of this project is to fabricate a test bed for the UAV propulsion system. To test the capability of measuri...
Saved in:
Main Author: | |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/10631/1/FKM-DIPLOMA-ADIB%20BIN%20AZMI.pdf http://umpir.ump.edu.my/id/eprint/10631/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|