Machinery risk assessment during warehouse racking installation / Fatimah Nadhirah Isa

In any work site, hazard and risk are the most common criteria that are needed to be reduce, minimize, or eliminate to assure a safety workplace for employees. Machinery and power tools were commonly used in a racking installation. Forklift, reach truck, and scissor lift contributed in the building...

Full description

Saved in:
Bibliographic Details
Main Author: Fatimah Nadhirah, Isa
Format: Thesis
Published: 2017
Subjects:
Online Access:http://studentsrepo.um.edu.my/8456/4/fatimah.pdf
http://studentsrepo.um.edu.my/8456/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.um.stud.8456
record_format eprints
spelling my.um.stud.84562019-07-23T19:49:02Z Machinery risk assessment during warehouse racking installation / Fatimah Nadhirah Isa Fatimah Nadhirah, Isa T Technology (General) TJ Mechanical engineering and machinery In any work site, hazard and risk are the most common criteria that are needed to be reduce, minimize, or eliminate to assure a safety workplace for employees. Machinery and power tools were commonly used in a racking installation. Forklift, reach truck, and scissor lift contributed in the building of the warehouse racking installation. However, the machinery were also contributed to high risk for the workers. Hazard and risk of machinery needed to be analyze before start of any work. One of the method that was used for hazard identification and risk assessment was Hazard Identification, Risk assessment, and Rick Control (HIRARC) method. This research study analyze the risk developed by machinery during warehouse racking installation located in Telok Panglima Garang site. The identification of hazard was done through inspection and observation on site. Every job task on site were analyzed and evaluated by following the HIRARC method. Questionnaire survey method was done on 30 workers with a purpose in determined the safety awareness during work and handling machinery. By using the HIRARC method, 25 job hazards have been identified as medium level hazard, and 2 job hazard have been identified as high level risk hazard. Physical hazard have been identified as the highest numbered type of hazard on site. Control measures were given based on the result obtained from the survey and the risk rating. 2017 Thesis NonPeerReviewed application/pdf http://studentsrepo.um.edu.my/8456/4/fatimah.pdf Fatimah Nadhirah, Isa (2017) Machinery risk assessment during warehouse racking installation / Fatimah Nadhirah Isa. Masters thesis, University of Malaya. http://studentsrepo.um.edu.my/8456/
institution Universiti Malaya
building UM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaya
content_source UM Student Repository
url_provider http://studentsrepo.um.edu.my/
topic T Technology (General)
TJ Mechanical engineering and machinery
spellingShingle T Technology (General)
TJ Mechanical engineering and machinery
Fatimah Nadhirah, Isa
Machinery risk assessment during warehouse racking installation / Fatimah Nadhirah Isa
description In any work site, hazard and risk are the most common criteria that are needed to be reduce, minimize, or eliminate to assure a safety workplace for employees. Machinery and power tools were commonly used in a racking installation. Forklift, reach truck, and scissor lift contributed in the building of the warehouse racking installation. However, the machinery were also contributed to high risk for the workers. Hazard and risk of machinery needed to be analyze before start of any work. One of the method that was used for hazard identification and risk assessment was Hazard Identification, Risk assessment, and Rick Control (HIRARC) method. This research study analyze the risk developed by machinery during warehouse racking installation located in Telok Panglima Garang site. The identification of hazard was done through inspection and observation on site. Every job task on site were analyzed and evaluated by following the HIRARC method. Questionnaire survey method was done on 30 workers with a purpose in determined the safety awareness during work and handling machinery. By using the HIRARC method, 25 job hazards have been identified as medium level hazard, and 2 job hazard have been identified as high level risk hazard. Physical hazard have been identified as the highest numbered type of hazard on site. Control measures were given based on the result obtained from the survey and the risk rating.
format Thesis
author Fatimah Nadhirah, Isa
author_facet Fatimah Nadhirah, Isa
author_sort Fatimah Nadhirah, Isa
title Machinery risk assessment during warehouse racking installation / Fatimah Nadhirah Isa
title_short Machinery risk assessment during warehouse racking installation / Fatimah Nadhirah Isa
title_full Machinery risk assessment during warehouse racking installation / Fatimah Nadhirah Isa
title_fullStr Machinery risk assessment during warehouse racking installation / Fatimah Nadhirah Isa
title_full_unstemmed Machinery risk assessment during warehouse racking installation / Fatimah Nadhirah Isa
title_sort machinery risk assessment during warehouse racking installation / fatimah nadhirah isa
publishDate 2017
url http://studentsrepo.um.edu.my/8456/4/fatimah.pdf
http://studentsrepo.um.edu.my/8456/
_version_ 1738506144440123392
score 13.211869