Power system study for oil and gas platform connected to onshore grid / Rosshidi Hezrimi Taharim

Normally for oil and gas offshore platform, the electrical power supply is generated from the generator either using gas turbine generator, gas engine generator and diesel engine generator. The main power supply is backup by diesel engine generator in case emergency or during black start of the p...

Full description

Saved in:
Bibliographic Details
Main Author: Rosshidi Hezrimi, Taharim
Format: Thesis
Published: 2020
Subjects:
Online Access:http://studentsrepo.um.edu.my/11914/1/Rosshidi_Hezrimi_bin_Taharim.jpg
http://studentsrepo.um.edu.my/11914/12/rosshidi.pdf
http://studentsrepo.um.edu.my/11914/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.um.stud.11914
record_format eprints
spelling my.um.stud.119142021-05-16T20:02:45Z Power system study for oil and gas platform connected to onshore grid / Rosshidi Hezrimi Taharim Rosshidi Hezrimi, Taharim TK Electrical engineering. Electronics Nuclear engineering Normally for oil and gas offshore platform, the electrical power supply is generated from the generator either using gas turbine generator, gas engine generator and diesel engine generator. The main power supply is backup by diesel engine generator in case emergency or during black start of the platform. As the design of oil and gas platform become complex, the size of generator keeps increasing. A new concept is being explored to mitigate this problem. Oil and gas company is looking to provide power generation from onshore and supplying the electrical power to a substation platform offshore and then distributed it to various platform. Even though the idea is feasible, but there is a challenge technically. One of the technical expect that need to be carefully consider is the Ferranti effect over long transmission line, in this case the submarine cable. Therefore, some study needs to be done to analyze the stability of the power system when a system is connected to long submarine cable. When there is long transmission line, the tendency of Ferranti effect to occur is likely. So, this study is performed to study the magnitude of Ferranti effect on the propose system and how to mitigate this power stability issue. A load flow study is perform using ETAP software to determine the effect of Ferranti Effect on difference length of submarine cable. Shunt reactor is used as the mitigation method to the Ferranti Effect. This study also determined the size of shunt reactor required over the length of submarine cable. Short circuit study was performed to determine the short circuit level at the receiving end for different length of submarine cable. This short circuit level is crucial in determined the rating of switchgear at the offshore. 2020-06 Thesis NonPeerReviewed application/pdf http://studentsrepo.um.edu.my/11914/1/Rosshidi_Hezrimi_bin_Taharim.jpg application/pdf http://studentsrepo.um.edu.my/11914/12/rosshidi.pdf Rosshidi Hezrimi, Taharim (2020) Power system study for oil and gas platform connected to onshore grid / Rosshidi Hezrimi Taharim. Masters thesis, University Malaya. http://studentsrepo.um.edu.my/11914/
institution Universiti Malaya
building UM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaya
content_source UM Student Repository
url_provider http://studentsrepo.um.edu.my/
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Rosshidi Hezrimi, Taharim
Power system study for oil and gas platform connected to onshore grid / Rosshidi Hezrimi Taharim
description Normally for oil and gas offshore platform, the electrical power supply is generated from the generator either using gas turbine generator, gas engine generator and diesel engine generator. The main power supply is backup by diesel engine generator in case emergency or during black start of the platform. As the design of oil and gas platform become complex, the size of generator keeps increasing. A new concept is being explored to mitigate this problem. Oil and gas company is looking to provide power generation from onshore and supplying the electrical power to a substation platform offshore and then distributed it to various platform. Even though the idea is feasible, but there is a challenge technically. One of the technical expect that need to be carefully consider is the Ferranti effect over long transmission line, in this case the submarine cable. Therefore, some study needs to be done to analyze the stability of the power system when a system is connected to long submarine cable. When there is long transmission line, the tendency of Ferranti effect to occur is likely. So, this study is performed to study the magnitude of Ferranti effect on the propose system and how to mitigate this power stability issue. A load flow study is perform using ETAP software to determine the effect of Ferranti Effect on difference length of submarine cable. Shunt reactor is used as the mitigation method to the Ferranti Effect. This study also determined the size of shunt reactor required over the length of submarine cable. Short circuit study was performed to determine the short circuit level at the receiving end for different length of submarine cable. This short circuit level is crucial in determined the rating of switchgear at the offshore.
format Thesis
author Rosshidi Hezrimi, Taharim
author_facet Rosshidi Hezrimi, Taharim
author_sort Rosshidi Hezrimi, Taharim
title Power system study for oil and gas platform connected to onshore grid / Rosshidi Hezrimi Taharim
title_short Power system study for oil and gas platform connected to onshore grid / Rosshidi Hezrimi Taharim
title_full Power system study for oil and gas platform connected to onshore grid / Rosshidi Hezrimi Taharim
title_fullStr Power system study for oil and gas platform connected to onshore grid / Rosshidi Hezrimi Taharim
title_full_unstemmed Power system study for oil and gas platform connected to onshore grid / Rosshidi Hezrimi Taharim
title_sort power system study for oil and gas platform connected to onshore grid / rosshidi hezrimi taharim
publishDate 2020
url http://studentsrepo.um.edu.my/11914/1/Rosshidi_Hezrimi_bin_Taharim.jpg
http://studentsrepo.um.edu.my/11914/12/rosshidi.pdf
http://studentsrepo.um.edu.my/11914/
_version_ 1738506544602939392
score 13.211869