Risk factors in the refurbishment design process: The case of Malaysia
Purpose: Refurbishment projects are mainly due to building physical improvements and extensive repair work. However, it is more difficult to manage refurbishment compared to new building projects, due to risk factors. Therefore, this paper aims to identify the risk variables in the refurbishment des...
Saved in:
Main Authors: | Ali, Azlan Shah, Au-Yong, Cheong Peng |
---|---|
Format: | Article |
Published: |
Emerald Publishing
2022
|
Subjects: | |
Online Access: | http://eprints.um.edu.my/43652/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The designer in refurbishment projects: implications to the compatibility of design
by: Ali, A.S., et al.
Published: (2013) -
Cost performance of building refurbishment works: the case of Malaysia
by: Ali, Azlan Shah, et al.
Published: (2018) -
Uncertainty of building regulation for refurbishment projects in Malaysia
by: Ali, A.S., et al.
Published: (2010) -
Complexity in refurbishment of services system for historical buildings in Malaysia
by: Ali, A.S.
Published: (2009) -
Preventive maintenance characteristics towards optimal maintenance performance: A case study of office buildings
by: Au-Yong, Cheong Peng, et al.
Published: (2014)