Delay Factors Management and Ranking for Reconstruction and Rehabilitation Projects Based on the Relative Importance Index (RII)
In recent decades, the construction industry has developed rapidly. Delay was and remains one of the most important challenges negatively affecting not only this industry but also the economy and sustainable development. This study aims to conduct a comprehensive analysis of the delay factors in rec...
Saved in:
Main Authors: | Al Khatib, Basem, Poh, Yap Soon, El-Shafie, Ahmed |
---|---|
Format: | Article |
Published: |
MDPI
2020
|
Subjects: | |
Online Access: | http://eprints.um.edu.my/36501/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Ranking of railway construction project delay factors in Malaysia by using relative importance index (RII)
by: Ramli M.Z., et al.
Published: (2023) -
Relative importance index (RII) in ranking of procrastination factors among university students
by: Aziz, Nazrina, et al.
Published: (2016) -
Relative importance index (RII) in ranking of quality factors on industrialised building system (IBS) projects in Malaysia
by: Azman, N.S., et al.
Published: (2020) -
Relative importance index (RII) in ranking of quality factors on industrialised building system (IBS) projects in Malaysia
by: Azman N.S., et al.
Published: (2023) -
Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project
by: Al Khatib, Basem, et al.
Published: (2018)