Exploring the underlying factors inducing design changes during building production
Although design changes is a significant inhibiting factor to schedule management and cost control in building projects globally, however, the reasons remain largely unknown, and the construction industry is unable to manage the problem effectively. A triangulated approach was employed where 39 reas...
Saved in:
Main Authors: | Yap, Jeffrey Boon Hui, Abdul-Rahman, Hamzah, Wang, Chen, Skitmore, Martin |
---|---|
Format: | Article |
Published: |
Taylor & Francis
2018
|
Subjects: | |
Online Access: | http://eprints.um.edu.my/20314/ https://doi.org/10.1080/09537287.2018.1448127 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Investigating design changes in Malaysian building projects
by: Yap, Jeffrey Boon Hui, et al.
Published: (2018) -
Knowledge modelling for contract disputes and change control
by: Wang, Chen, et al.
Published: (2019) -
The study of the effectiveness of design and build (D&B) procurement method in Malaysia
by: Yap, Jeffrey Boon Hui
Published: (2003) -
Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach
by: Yap, Jeffrey Boon Hui, et al.
Published: (2018) -
Capabilities-based forecasting model for innovation development in small-and-medium construction firms (SMCFS)
by: Wang, Chen, et al.
Published: (2018)