Prediction cost maintenance model of office building based on condition-based maintenance

Building maintenance costs are continuously increasing as a result of poor maintenance. Consequently, there is an urgent need to develop solutions to reduce the maintenance costs. Various studies demonstrated that the characteristics of condition-based maintenance are directly related to the cost pe...

Full description

Saved in:
Bibliographic Details
Main Authors: Au-Yong, C.P., Ali, A.S., Ahmad, F.
Format: Article
Language:English
Published: Polish Maintenance Society 2014
Subjects:
Online Access:http://eprints.um.edu.my/11442/1/Published_Paper.pdf
http://eprints.um.edu.my/11442/
http://www.ein.org.pl/sites/default/files/2014-02-21.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.um.eprints.11442
record_format eprints
spelling my.um.eprints.114422014-12-04T06:24:41Z http://eprints.um.edu.my/11442/ Prediction cost maintenance model of office building based on condition-based maintenance Au-Yong, C.P. Ali, A.S. Ahmad, F. TH Building construction Building maintenance costs are continuously increasing as a result of poor maintenance. Consequently, there is an urgent need to develop solutions to reduce the maintenance costs. Various studies demonstrated that the characteristics of condition-based maintenance are directly related to the cost performance. Thus, this paper seeks to establish the relationships between the characteristics of condition-based maintenance and the cost performance. The researcher then developed a regression model for maintenance planning and prediction. The study adopted a mix method approach that includes questionnaire survey, interview, and case study. The findings highlighted the reliability of maintenance data and information as the most significant characteristic of condition-based maintenance. Consequently, the study concluded that the planning and the application of the condition-based maintenance strategy should consider its significant characteristics and make reference to the resulting prediction model. Furthermore, the study recommended measures to improve the significant characteristics and the cost performance in practice. Polish Maintenance Society 2014 Article PeerReviewed application/pdf en http://eprints.um.edu.my/11442/1/Published_Paper.pdf Au-Yong, C.P. and Ali, A.S. and Ahmad, F. (2014) Prediction cost maintenance model of office building based on condition-based maintenance. Eksploatacja i Niezawodnosc - Maintenance and Reliability, 16 (2). pp. 319-324. ISSN 1507-2711 http://www.ein.org.pl/sites/default/files/2014-02-21.pdf
institution Universiti Malaya
building UM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaya
content_source UM Research Repository
url_provider http://eprints.um.edu.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Au-Yong, C.P.
Ali, A.S.
Ahmad, F.
Prediction cost maintenance model of office building based on condition-based maintenance
description Building maintenance costs are continuously increasing as a result of poor maintenance. Consequently, there is an urgent need to develop solutions to reduce the maintenance costs. Various studies demonstrated that the characteristics of condition-based maintenance are directly related to the cost performance. Thus, this paper seeks to establish the relationships between the characteristics of condition-based maintenance and the cost performance. The researcher then developed a regression model for maintenance planning and prediction. The study adopted a mix method approach that includes questionnaire survey, interview, and case study. The findings highlighted the reliability of maintenance data and information as the most significant characteristic of condition-based maintenance. Consequently, the study concluded that the planning and the application of the condition-based maintenance strategy should consider its significant characteristics and make reference to the resulting prediction model. Furthermore, the study recommended measures to improve the significant characteristics and the cost performance in practice.
format Article
author Au-Yong, C.P.
Ali, A.S.
Ahmad, F.
author_facet Au-Yong, C.P.
Ali, A.S.
Ahmad, F.
author_sort Au-Yong, C.P.
title Prediction cost maintenance model of office building based on condition-based maintenance
title_short Prediction cost maintenance model of office building based on condition-based maintenance
title_full Prediction cost maintenance model of office building based on condition-based maintenance
title_fullStr Prediction cost maintenance model of office building based on condition-based maintenance
title_full_unstemmed Prediction cost maintenance model of office building based on condition-based maintenance
title_sort prediction cost maintenance model of office building based on condition-based maintenance
publisher Polish Maintenance Society
publishDate 2014
url http://eprints.um.edu.my/11442/1/Published_Paper.pdf
http://eprints.um.edu.my/11442/
http://www.ein.org.pl/sites/default/files/2014-02-21.pdf
_version_ 1643689059661381632
score 13.211869