Constructability improvement during field operations/ Amirudin Awang Chik
Constructability can be define as the optimum use of construction knowledge and experience in planning, design, procurement and field operations to achieve overall project objectives. Constructability issues still exist during field operations. Once in the field, constructors can still achieve Const...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
1992
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/99741/1/99741.pdf https://ir.uitm.edu.my/id/eprint/99741/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.99741 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.997412024-09-03T22:46:12Z https://ir.uitm.edu.my/id/eprint/99741/ Constructability improvement during field operations/ Amirudin Awang Chik Awang Chik, Amirudin Structural engineering Constructability can be define as the optimum use of construction knowledge and experience in planning, design, procurement and field operations to achieve overall project objectives. Constructability issues still exist during field operations. Once in the field, constructors can still achieve Constructability benefits from their action alone. Field operations Constructability is not a packaging of the basics of construction management, control of cost, quality and safety, schedule and the management of materials and manpower. Rather, the focus is on the development and effective utilisation of innovative field construction methods that simplify construction effort and reduce project costs. The employed research method was an iterative process of issue identification, literature search, site interviews and analysis. Innovative construction methods may involve innovations related to materials/system, field tasks, handtools, constructor-optional temporary construction preassembly, temporary construction equipment, facilities, directly supportive of field methods or post-bid constructor preferences. 1992 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/99741/1/99741.pdf Constructability improvement during field operations/ Amirudin Awang Chik. (1992) Advanced Diploma thesis, thesis, Universiti Teknologi MARA (UiTM). <http://terminalib.uitm.edu.my/99741.pdf> |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Structural engineering |
spellingShingle |
Structural engineering Awang Chik, Amirudin Constructability improvement during field operations/ Amirudin Awang Chik |
description |
Constructability can be define as the optimum use of construction knowledge and experience in planning, design, procurement and field operations to achieve overall project objectives. Constructability issues still exist during field operations. Once in the field, constructors can still achieve Constructability benefits from their action alone. Field operations Constructability is not a packaging of the basics of construction management, control of cost, quality and safety, schedule and the management of materials and manpower. Rather, the focus is on the development and effective utilisation of innovative field construction methods that simplify construction effort and reduce project costs. The employed research method was an iterative process of issue identification, literature search, site interviews and analysis. Innovative construction methods may involve innovations related to materials/system, field tasks, handtools, constructor-optional temporary construction preassembly, temporary construction equipment, facilities, directly supportive of field methods or post-bid constructor preferences. |
format |
Thesis |
author |
Awang Chik, Amirudin |
author_facet |
Awang Chik, Amirudin |
author_sort |
Awang Chik, Amirudin |
title |
Constructability improvement during field operations/ Amirudin Awang Chik |
title_short |
Constructability improvement during field operations/ Amirudin Awang Chik |
title_full |
Constructability improvement during field operations/ Amirudin Awang Chik |
title_fullStr |
Constructability improvement during field operations/ Amirudin Awang Chik |
title_full_unstemmed |
Constructability improvement during field operations/ Amirudin Awang Chik |
title_sort |
constructability improvement during field operations/ amirudin awang chik |
publishDate |
1992 |
url |
https://ir.uitm.edu.my/id/eprint/99741/1/99741.pdf https://ir.uitm.edu.my/id/eprint/99741/ |
_version_ |
1811598125309100032 |
score |
13.211869 |