10-in-1 smart problem-solving kit as learning equipment in measurement of construction works class / Roseline Ikau … [et al.]
Forgetting is normal under certain circumstances, but in university, forgetting leads to low grades and sometimes dismissal. Subsequently, the issue of built environment students forgetting their learning equipment in Measurement of Construction class is one common problem which raises worry among t...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Book Section |
Language: | English |
Published: |
Bahagian Penyelidikan dan Jaringan Industri, UiTM Melaka
2022
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/97978/1/97978.pdf https://ir.uitm.edu.my/id/eprint/97978/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Forgetting is normal under certain circumstances, but in university, forgetting leads to low grades and sometimes dismissal. Subsequently, the issue of built environment students forgetting their learning equipment in Measurement of Construction class is one common problem which raises worry among the lecturers regarding the students’ final examination grades. Hence, the 10-in-1 Smart Problem-Solving Kit is invented to keep all the equipment and necessities for the course. This kit contains ten (10) major pieces of learning equipment that will fulfil the needs of the course syllabus i.e. (1) a manual [Standard Method of Measurement for Building Works (SMM2)], (2) a reference book (Pengukuran Kuantiti Bangunan by Ahamad Abdullah and Khairuddin Abdul Rashid), (3) a set of drawing for measurement, (4) a set of Scale Ruler and a calculator, (5) a booklet of Dimension or TakingOff paper, (6) a set of Treasury Green Tag, (7) a set of Blue or Black and Red pen, (8) a set of Stapler and Bullet, (9) a set of colour pencil, and (10) a small hole single puncher. These ten major pieces of learning equipment material is essential for Measurement of Construction Works class where “Measurement” is the transformation of drawn information into description and quantities, undertaken to value, cost, and price construction work, as well as enabling effective management. |
---|