Effect of overtime towards construction labour: a contractor’s perspective / Muhammad Nashrul Hazim Shaharudin and Wan Faida Wan Mohd Azmi

Overtime is common in the construction industry where projects often require a shorter completion time. Contractors use overtime as a way to speed up construction work but it comes with drawbacks. Overtime workers are less productive, leading to increased project costs. This study aimed to identify...

Full description

Saved in:
Bibliographic Details
Main Authors: Shaharudin, Muhammad Nashrul Hazim, Wan Mohd Azmi, Wan Faida
Format: Conference or Workshop Item
Language:English
Published: 2023
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/97206/1/97206.pdf
https://ir.uitm.edu.my/id/eprint/97206/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.97206
record_format eprints
spelling my.uitm.ir.972062024-09-03T16:42:44Z https://ir.uitm.edu.my/id/eprint/97206/ Effect of overtime towards construction labour: a contractor’s perspective / Muhammad Nashrul Hazim Shaharudin and Wan Faida Wan Mohd Azmi Shaharudin, Muhammad Nashrul Hazim Wan Mohd Azmi, Wan Faida Contractors Overtime is common in the construction industry where projects often require a shorter completion time. Contractors use overtime as a way to speed up construction work but it comes with drawbacks. Overtime workers are less productive, leading to increased project costs. This study aimed to identify the effects of overtime on construction labor, investigate its causes, and propose solutions. Questionnaires were distributed to Grade 7 contractors in Johor Bahru, and the data was analyzed using statistical methods. Akta Kerja 1955 is a deed that sets the minimum employment standards for private sector workers, regardless of union membership. It provides a comprehensive framework for employment laws, covering various aspects such as wages, rest days, working hours, annual leave, sick leave, maternity protection, termination of contracts, and the hiring of foreign workers. The study found that overtime reduces labor productivity, causes fatigue, increases absenteeism, lowers worker morale, and raises accident rates on construction sites. Overall, the study successfully achieved its objectives and used data collection and analysis to support its findings. 2023-10 Conference or Workshop Item PeerReviewed text en https://ir.uitm.edu.my/id/eprint/97206/1/97206.pdf Effect of overtime towards construction labour: a contractor’s perspective / Muhammad Nashrul Hazim Shaharudin and Wan Faida Wan Mohd Azmi. (2023) In: UNSPECIFIED.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Contractors
spellingShingle Contractors
Shaharudin, Muhammad Nashrul Hazim
Wan Mohd Azmi, Wan Faida
Effect of overtime towards construction labour: a contractor’s perspective / Muhammad Nashrul Hazim Shaharudin and Wan Faida Wan Mohd Azmi
description Overtime is common in the construction industry where projects often require a shorter completion time. Contractors use overtime as a way to speed up construction work but it comes with drawbacks. Overtime workers are less productive, leading to increased project costs. This study aimed to identify the effects of overtime on construction labor, investigate its causes, and propose solutions. Questionnaires were distributed to Grade 7 contractors in Johor Bahru, and the data was analyzed using statistical methods. Akta Kerja 1955 is a deed that sets the minimum employment standards for private sector workers, regardless of union membership. It provides a comprehensive framework for employment laws, covering various aspects such as wages, rest days, working hours, annual leave, sick leave, maternity protection, termination of contracts, and the hiring of foreign workers. The study found that overtime reduces labor productivity, causes fatigue, increases absenteeism, lowers worker morale, and raises accident rates on construction sites. Overall, the study successfully achieved its objectives and used data collection and analysis to support its findings.
format Conference or Workshop Item
author Shaharudin, Muhammad Nashrul Hazim
Wan Mohd Azmi, Wan Faida
author_facet Shaharudin, Muhammad Nashrul Hazim
Wan Mohd Azmi, Wan Faida
author_sort Shaharudin, Muhammad Nashrul Hazim
title Effect of overtime towards construction labour: a contractor’s perspective / Muhammad Nashrul Hazim Shaharudin and Wan Faida Wan Mohd Azmi
title_short Effect of overtime towards construction labour: a contractor’s perspective / Muhammad Nashrul Hazim Shaharudin and Wan Faida Wan Mohd Azmi
title_full Effect of overtime towards construction labour: a contractor’s perspective / Muhammad Nashrul Hazim Shaharudin and Wan Faida Wan Mohd Azmi
title_fullStr Effect of overtime towards construction labour: a contractor’s perspective / Muhammad Nashrul Hazim Shaharudin and Wan Faida Wan Mohd Azmi
title_full_unstemmed Effect of overtime towards construction labour: a contractor’s perspective / Muhammad Nashrul Hazim Shaharudin and Wan Faida Wan Mohd Azmi
title_sort effect of overtime towards construction labour: a contractor’s perspective / muhammad nashrul hazim shaharudin and wan faida wan mohd azmi
publishDate 2023
url https://ir.uitm.edu.my/id/eprint/97206/1/97206.pdf
https://ir.uitm.edu.my/id/eprint/97206/
_version_ 1811596760307466240
score 13.211869