The extension of time of Kajang 2 commuter station / Siti Aisyah Afifah Zulkifli
Extension of Time (EOT) is a very common thing that happens in the construction. The EOT can arise due to many factors, such as actual factor or intended factor. Therefore, this report will discuss about the process of EOT that can be claims by the contractor when the construction of the project bei...
Saved in:
Main Author: | Zulkifli, Siti Aisyah Afifah |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2019
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/97038/1/97038.pdf https://ir.uitm.edu.my/id/eprint/97038/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Procurement of roller shutter for Masjid Kota Kemuning, Seksyen 31 Shah Alam / Mohammad Zulfazdley Mohd Zulkifli Cheng
by: Mohd Zulkifli Cheng, Mohammad Zulfazdley
Published: (2018) -
The construction of ground floor slab for administration building, Sakj Lebai Mohd Yaakob, Ayer Baloi, Pontian, Johor / Siti Nur Azirah Bachok
by: Bachok, Siti Nur Azirah
Published: (2018) -
A study of building plan approval for extension and renovation work (individual application) / Ahmad Faisal Mohd Isa
by: Mohd Isa, Ahmad Faisal
Published: (2008) -
An integrated value management (IVM)
framework for contractors in design and
build (D&B) projects / Siti Hamidah Abdul Hamid
by: Abdul Hamid, Siti Hamidah
Published: (2014) -
The facilities for person with disabilities in Public Hospital at Perak / Nurul Ainaa Afifah Ahmad Basri
by: Ahmad Basri, Nurul Ainaa Afifah
Published: (2021)