Piling works of reinforced concrete pile / 'Ayuni Nadhirah Mohamad Yamin
This report describes the whole activities during my five months of industrial training at Fast Tech Builders Sdn. Bhd. The company handle construction work involving government agencies as well as the private sector. This report describes in detail the background of the company, inventory managemen...
Saved in:
Main Author: | Mohamad Yamin, Ayuni Nadhirah |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2019
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/95897/1/95897.pdf https://ir.uitm.edu.my/id/eprint/95897/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Piling works: Jack in piles / Ariff Irwan Asmawi
by: Asmawi, Ariff Irwan
Published: (2019) -
Static load test for spun pile piling / Mohamad Fazrul Arhan Mohamed Shaharudin
by: Mohamed Shaharudin, Mohamad Fazrul Arhan
Published: (2018) -
RC pile and pile cap construction / Nur Zulaikha Mohd Razip
by: Mohd Razip, Nur Zulaikha
Published: (2018) -
Method installation of precast concrete pile using hydraulic injection (Jack-In Pile) system / Muhammad Amir Syahmi Sukhairul
by: Sukhairul, Muhammad Amir Syahmi
Published: (2018) -
Earthwork and piling works / Nik Ahmad Bakri Mohd Iburadi
by: Mohd Iburadi, Nik Ahmad Bakri
Published: (2018)