Factors influencing the level of readiness of designers in implementing IBS construction projects / Imilia Husna Dilah and Wan Norizan Wan Ismail
IBS is a system and technique that require as little additional site work as possible. Their components can be manufactured on-site or off-site before being transported, positioned, and assembled into a structure. Many incentives have been given to encourage the adoption of IBS in Malaysian construc...
Saved in:
Main Authors: | Dilah, Imilia Husna, Wan Ismail, Wan Norizan |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2023
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/94903/1/94903.pdf https://ir.uitm.edu.my/id/eprint/94903/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Contractual behaviour framework for successful civil engineering projects / Wan Norizan Wan Ismail
by: Wan Ismail, Wan Norizan
Published: (2021) -
The influence of project characteristics on contractual behaviour of key participants in civil engineering projects / Wan Norizan Wan Ismail and Hamimah Adnan
by: Wan Ismail, Wan Norizan, et al.
Published: (2020) -
Unmanned aerial system (UAS) for monitoring and communication in IBS construction project / Anis Sofea Mad Said and Wan Akmal Zahri Wan Zaharuddin
by: Mad Said, Anis Sofea, et al.
Published: (2019) -
The influence of client attributes on project success : a focus on the briefing stage / Norizan Ahmad
by: Ahmad, Norizan
Published: (2008) -
A study on the readiness of building owner in enhancing building performance by embracing green building concept / Wan Nur Farahin Wan Ismail
by: Wan Ismail, Wan Nur Farahin
Published: (2015)