Connection cable service projects 11kv, 33kv and 132kv (workline engineering) / Muhammad Iqbal Khan Ibrahim
Practical Training refers to work experience that is relevant to professional development prior to graduation. One of the requirements for the students of Degree in Building Surveying to complete the program is the students must complete at least 16 weeks of Practical Training. It started on 1st Oct...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA UiTM,Perak
2022
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/91623/1/91623.pdf https://ir.uitm.edu.my/id/eprint/91623/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.91623 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.916232024-03-04T04:31:17Z https://ir.uitm.edu.my/id/eprint/91623/ Connection cable service projects 11kv, 33kv and 132kv (workline engineering) / Muhammad Iqbal Khan Ibrahim Ibrahim, Muhammad Iqbal Khan Work measurement. Methods engineering Electric meters Practical Training refers to work experience that is relevant to professional development prior to graduation. One of the requirements for the students of Degree in Building Surveying to complete the program is the students must complete at least 16 weeks of Practical Training. It started on 1st October 2021 and end on 31th January 2022.During the four months of practical training at Workline Engineering SDN. BHD. have learned how theory and practical can be combined together in useful ways and how remarkable and enjoyable practical training could be. While deadlines and skills are highly demanded, creativity is not limited and true innovation occurs throughout my practical training in Engineering of Electrical and Connection Cable As a result, I gained more knowledge and learned new things and most importantly I experienced the real working environment all by myself. Universiti Teknologi MARA UiTM,Perak 2022 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/91623/1/91623.pdf Connection cable service projects 11kv, 33kv and 132kv (workline engineering) / Muhammad Iqbal Khan Ibrahim. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Work measurement. Methods engineering Electric meters |
spellingShingle |
Work measurement. Methods engineering Electric meters Ibrahim, Muhammad Iqbal Khan Connection cable service projects 11kv, 33kv and 132kv (workline engineering) / Muhammad Iqbal Khan Ibrahim |
description |
Practical Training refers to work experience that is relevant to professional development prior to graduation. One of the requirements for the students of Degree in Building Surveying to complete the program is the students must complete at least 16 weeks of Practical Training. It started on 1st October 2021 and end on 31th January 2022.During the four months of practical training at Workline Engineering SDN. BHD. have learned how theory and practical can be combined together in useful ways and how remarkable and enjoyable practical training could be. While deadlines and skills are highly demanded, creativity is not limited and true innovation occurs throughout my practical training in Engineering of Electrical and Connection Cable As a result, I gained more knowledge and learned new things and most importantly I experienced the real working environment all by myself. |
format |
Monograph |
author |
Ibrahim, Muhammad Iqbal Khan |
author_facet |
Ibrahim, Muhammad Iqbal Khan |
author_sort |
Ibrahim, Muhammad Iqbal Khan |
title |
Connection cable service projects 11kv, 33kv and 132kv (workline engineering) / Muhammad Iqbal Khan Ibrahim |
title_short |
Connection cable service projects 11kv, 33kv and 132kv (workline engineering) / Muhammad Iqbal Khan Ibrahim |
title_full |
Connection cable service projects 11kv, 33kv and 132kv (workline engineering) / Muhammad Iqbal Khan Ibrahim |
title_fullStr |
Connection cable service projects 11kv, 33kv and 132kv (workline engineering) / Muhammad Iqbal Khan Ibrahim |
title_full_unstemmed |
Connection cable service projects 11kv, 33kv and 132kv (workline engineering) / Muhammad Iqbal Khan Ibrahim |
title_sort |
connection cable service projects 11kv, 33kv and 132kv (workline engineering) / muhammad iqbal khan ibrahim |
publisher |
Universiti Teknologi MARA UiTM,Perak |
publishDate |
2022 |
url |
https://ir.uitm.edu.my/id/eprint/91623/1/91623.pdf https://ir.uitm.edu.my/id/eprint/91623/ |
_version_ |
1793161898845274112 |
score |
13.211869 |