Case study: efficiency and utilization of electricity and a comparative study / Azizah Ismail
The main objective of this project was to compare the electrical energy efficiency and energy utilization between two hospitals namely: i. Hospital Nucleus Port Dickson (HNPD) ii. Hospital Daerah Tampin (HDT ) The two hospitals were chosen because they were built in two different eras with different...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2004
|
Online Access: | https://ir.uitm.edu.my/id/eprint/84874/1/84874.pdf https://ir.uitm.edu.my/id/eprint/84874/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!