Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin
A swimming pool is a water facility that is designed to hold water to a certain capacity in order for swimming or other leisure activities. Above ground level swimming pool types that used the glass wall has a lot of benefits to the owner and for the house itself in the context of the house surround...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2022
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/84643/2/84643.PDF https://ir.uitm.edu.my/id/eprint/84643/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.84643 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.846432023-12-17T01:10:36Z https://ir.uitm.edu.my/id/eprint/84643/ Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin Saidin, Muhammad Aminuddin Details in building design and construction.Including walls, roofs A swimming pool is a water facility that is designed to hold water to a certain capacity in order for swimming or other leisure activities. Above ground level swimming pool types that used the glass wall has a lot of benefits to the owner and for the house itself in the context of the house surrounding. Therefore, this report briefly describes the construction of the above-ground level swimming pool. The objective of this report is to identify the construction method of above ground level swimming pool. In this report, a compressive explanation on the construction method started from the setting out until the testing and commissioning, including equipment, material, and the worker is described to give the overall view about the construction process. On top of that, the problems that occurred during the construction which represent the second objective also been stated along with the solutions to those problems. Three methods of study which is observation, unstructured interview and document review were applied as the data collection and references to achieve a detail explanation on the construction method of this swimming pool. Hope this report can provide knowledge to the reader about each construction method in order to construct the above ground level swimming pool. Universiti Teknologi MARA, Perak 2022 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/84643/2/84643.PDF Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Details in building design and construction.Including walls, roofs |
spellingShingle |
Details in building design and construction.Including walls, roofs Saidin, Muhammad Aminuddin Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin |
description |
A swimming pool is a water facility that is designed to hold water to a certain capacity in order for swimming or other leisure activities. Above ground level swimming pool types that used the glass wall has a lot of benefits to the owner and for the house itself in the context of the house surrounding. Therefore, this report briefly describes the construction of the above-ground level swimming pool. The objective of this report is to identify the construction method of above ground level swimming pool. In this report, a compressive explanation on the construction method started from the setting out until the testing and commissioning, including equipment, material, and the worker is described to give the overall view about the construction process. On top of that, the problems that occurred during the construction which represent the second objective also been stated along with the solutions to those problems. Three methods of study which is observation, unstructured interview and document review were applied as the data collection and references to achieve a detail explanation on the construction method of this swimming pool. Hope this report can provide knowledge to the reader about each construction method in order to construct the above ground level swimming pool. |
format |
Monograph |
author |
Saidin, Muhammad Aminuddin |
author_facet |
Saidin, Muhammad Aminuddin |
author_sort |
Saidin, Muhammad Aminuddin |
title |
Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin |
title_short |
Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin |
title_full |
Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin |
title_fullStr |
Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin |
title_full_unstemmed |
Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin |
title_sort |
construction method of above ground level swimming pool / muhammad aminuddin saidin |
publisher |
Universiti Teknologi MARA, Perak |
publishDate |
2022 |
url |
https://ir.uitm.edu.my/id/eprint/84643/2/84643.PDF https://ir.uitm.edu.my/id/eprint/84643/ |
_version_ |
1787139531579850752 |
score |
13.211869 |