Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin

A swimming pool is a water facility that is designed to hold water to a certain capacity in order for swimming or other leisure activities. Above ground level swimming pool types that used the glass wall has a lot of benefits to the owner and for the house itself in the context of the house surround...

Full description

Saved in:
Bibliographic Details
Main Author: Saidin, Muhammad Aminuddin
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/84643/2/84643.PDF
https://ir.uitm.edu.my/id/eprint/84643/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.84643
record_format eprints
spelling my.uitm.ir.846432023-12-17T01:10:36Z https://ir.uitm.edu.my/id/eprint/84643/ Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin Saidin, Muhammad Aminuddin Details in building design and construction.Including walls, roofs A swimming pool is a water facility that is designed to hold water to a certain capacity in order for swimming or other leisure activities. Above ground level swimming pool types that used the glass wall has a lot of benefits to the owner and for the house itself in the context of the house surrounding. Therefore, this report briefly describes the construction of the above-ground level swimming pool. The objective of this report is to identify the construction method of above ground level swimming pool. In this report, a compressive explanation on the construction method started from the setting out until the testing and commissioning, including equipment, material, and the worker is described to give the overall view about the construction process. On top of that, the problems that occurred during the construction which represent the second objective also been stated along with the solutions to those problems. Three methods of study which is observation, unstructured interview and document review were applied as the data collection and references to achieve a detail explanation on the construction method of this swimming pool. Hope this report can provide knowledge to the reader about each construction method in order to construct the above ground level swimming pool. Universiti Teknologi MARA, Perak 2022 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/84643/2/84643.PDF Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Details in building design and construction.Including walls, roofs
spellingShingle Details in building design and construction.Including walls, roofs
Saidin, Muhammad Aminuddin
Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin
description A swimming pool is a water facility that is designed to hold water to a certain capacity in order for swimming or other leisure activities. Above ground level swimming pool types that used the glass wall has a lot of benefits to the owner and for the house itself in the context of the house surrounding. Therefore, this report briefly describes the construction of the above-ground level swimming pool. The objective of this report is to identify the construction method of above ground level swimming pool. In this report, a compressive explanation on the construction method started from the setting out until the testing and commissioning, including equipment, material, and the worker is described to give the overall view about the construction process. On top of that, the problems that occurred during the construction which represent the second objective also been stated along with the solutions to those problems. Three methods of study which is observation, unstructured interview and document review were applied as the data collection and references to achieve a detail explanation on the construction method of this swimming pool. Hope this report can provide knowledge to the reader about each construction method in order to construct the above ground level swimming pool.
format Monograph
author Saidin, Muhammad Aminuddin
author_facet Saidin, Muhammad Aminuddin
author_sort Saidin, Muhammad Aminuddin
title Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin
title_short Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin
title_full Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin
title_fullStr Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin
title_full_unstemmed Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin
title_sort construction method of above ground level swimming pool / muhammad aminuddin saidin
publisher Universiti Teknologi MARA, Perak
publishDate 2022
url https://ir.uitm.edu.my/id/eprint/84643/2/84643.PDF
https://ir.uitm.edu.my/id/eprint/84643/
_version_ 1787139531579850752
score 13.211869