Electrical installation challenges in steel framing system: Case study at District of Kuala Muda / Nur Husnina Zawari

Industrialized Building System (IBS) have start begin in Malaysia in early years 1960s and it is known as the precast concrete or prefabricated concrete. The Industrialize Building System (IBS) is prefabrication concrete that will involves the manufacture of components such as wall off site that ar...

Full description

Saved in:
Bibliographic Details
Main Author: Zawari, Nur Husnina
Format: Thesis
Language:English
Published: 2021
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/82887/1/82887.pdf
https://ir.uitm.edu.my/id/eprint/82887/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.82887
record_format eprints
spelling my.uitm.ir.828872023-12-14T01:54:03Z https://ir.uitm.edu.my/id/eprint/82887/ Electrical installation challenges in steel framing system: Case study at District of Kuala Muda / Nur Husnina Zawari Zawari, Nur Husnina Systems of building construction. Industrialized building Industrialized Building System (IBS) have start begin in Malaysia in early years 1960s and it is known as the precast concrete or prefabricated concrete. The Industrialize Building System (IBS) is prefabrication concrete that will involves the manufacture of components such as wall off site that are ready for the installation and need an extra work of installation on the site (CIDB, 2006). Introducing the IBS method is not to compete the conventional method but it is to modify and enhancing the better process of the construction industry in Malaysia. IBS system using a modern and innovative methods to construct a building (Ali, 2012). IBS is a system that have provide a short period of construction, lower cost of building materials and also the manpower in the construction in period of labour shortage (Dato’ Ir Ahmad `Asri, CIDB, 2006). The IBS need the specialized contractor in order to install it. But in Malaysia, we lack of specialized contractors especially the electrical and mechanical contractors. Most of the existing electrical and mechanical contractor are lack of knowledge and skills (Kamar.et.al, 2007). This becomes one of barriers in implemented the IBS. In this study, the main objective is to identify the level of competency amongst the electrical contractors. The second objective is to identify the challenges and issues on the installation the electrical system in steel framing system. The last objective is to identify the solution that use by the electrical contractor in solving the problem. In order to achieve the objectives of the study, the research study have conducted the online questionnaire survey with target the respondents which consists of the electrical contractor of IBS construction. The research study will offer the detail finding related to the study in the conclusion and recommendation for the future research. 2021 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/82887/1/82887.pdf Electrical installation challenges in steel framing system: Case study at District of Kuala Muda / Nur Husnina Zawari. (2021) Degree thesis, thesis, Universiti Teknologi MARA UiTM,Perak. <http://terminalib.uitm.edu.my/82887.pdf>
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Systems of building construction. Industrialized building
spellingShingle Systems of building construction. Industrialized building
Zawari, Nur Husnina
Electrical installation challenges in steel framing system: Case study at District of Kuala Muda / Nur Husnina Zawari
description Industrialized Building System (IBS) have start begin in Malaysia in early years 1960s and it is known as the precast concrete or prefabricated concrete. The Industrialize Building System (IBS) is prefabrication concrete that will involves the manufacture of components such as wall off site that are ready for the installation and need an extra work of installation on the site (CIDB, 2006). Introducing the IBS method is not to compete the conventional method but it is to modify and enhancing the better process of the construction industry in Malaysia. IBS system using a modern and innovative methods to construct a building (Ali, 2012). IBS is a system that have provide a short period of construction, lower cost of building materials and also the manpower in the construction in period of labour shortage (Dato’ Ir Ahmad `Asri, CIDB, 2006). The IBS need the specialized contractor in order to install it. But in Malaysia, we lack of specialized contractors especially the electrical and mechanical contractors. Most of the existing electrical and mechanical contractor are lack of knowledge and skills (Kamar.et.al, 2007). This becomes one of barriers in implemented the IBS. In this study, the main objective is to identify the level of competency amongst the electrical contractors. The second objective is to identify the challenges and issues on the installation the electrical system in steel framing system. The last objective is to identify the solution that use by the electrical contractor in solving the problem. In order to achieve the objectives of the study, the research study have conducted the online questionnaire survey with target the respondents which consists of the electrical contractor of IBS construction. The research study will offer the detail finding related to the study in the conclusion and recommendation for the future research.
format Thesis
author Zawari, Nur Husnina
author_facet Zawari, Nur Husnina
author_sort Zawari, Nur Husnina
title Electrical installation challenges in steel framing system: Case study at District of Kuala Muda / Nur Husnina Zawari
title_short Electrical installation challenges in steel framing system: Case study at District of Kuala Muda / Nur Husnina Zawari
title_full Electrical installation challenges in steel framing system: Case study at District of Kuala Muda / Nur Husnina Zawari
title_fullStr Electrical installation challenges in steel framing system: Case study at District of Kuala Muda / Nur Husnina Zawari
title_full_unstemmed Electrical installation challenges in steel framing system: Case study at District of Kuala Muda / Nur Husnina Zawari
title_sort electrical installation challenges in steel framing system: case study at district of kuala muda / nur husnina zawari
publishDate 2021
url https://ir.uitm.edu.my/id/eprint/82887/1/82887.pdf
https://ir.uitm.edu.my/id/eprint/82887/
_version_ 1787139517684121600
score 13.211869