Inter-organizational integration framework to reduce inter-organizational conflict in building refurbishment projects / Adel Noori

Refurbishment sector is becoming one of the most important sectors in the construction industry. In many developed countries, refurbishment sector contributes nearly half of the construction industry output. In Malaysia, 22 percent of construction output was related to refurbishment works in 2015. H...

Full description

Saved in:
Bibliographic Details
Main Author: Noori, Adel
Format: Thesis
Language:English
Published: 2018
Online Access:https://ir.uitm.edu.my/id/eprint/82721/2/82721.pdf
https://ir.uitm.edu.my/id/eprint/82721/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.82721
record_format eprints
spelling my.uitm.ir.827212023-11-30T09:27:41Z https://ir.uitm.edu.my/id/eprint/82721/ Inter-organizational integration framework to reduce inter-organizational conflict in building refurbishment projects / Adel Noori Noori, Adel Refurbishment sector is becoming one of the most important sectors in the construction industry. In many developed countries, refurbishment sector contributes nearly half of the construction industry output. In Malaysia, 22 percent of construction output was related to refurbishment works in 2015. However, refurbishment projects are more uncertain than new-build projects. Thus, inter-organizational conflicts are likely to happen, due to the uncertainty and the involvement of many organizations in building refurbishment projects. This suggests that refurbishment projects require inter-organizational integration to reduce the inter-organizational conflict. Therefore, the aim of this study is to develop an inter-organizational integration framework to reduce inter-organizational conflict in building refurbishment projects in Malaysia. This aim is achieved through the following four objectives: (1) to measure the level of uncertainty in building refurbishment projects; (2) to measure the level of inter-organizational conflict in building refurbishment projects; (3) to measure the degree of inter-organizational integration in building refurbishment projects; and (4) to investigate the relationship between uncertainty and inter-organizational conflict and inter-organizational integration as a mediator in building refurbishment projects. The respondents of this study are boundary role persons who represent construction or architectural firms in dealing with other organizations in building refurbishment projects (e.g., project managers, architects, contract managers) from construction and architectural firms in Malaysia. This study adopted the quantitative method of data collection. 2018 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/82721/2/82721.pdf Inter-organizational integration framework to reduce inter-organizational conflict in building refurbishment projects / Adel Noori. (2018) PhD thesis, thesis, Universiti Teknologi MARA (UiTM).
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
description Refurbishment sector is becoming one of the most important sectors in the construction industry. In many developed countries, refurbishment sector contributes nearly half of the construction industry output. In Malaysia, 22 percent of construction output was related to refurbishment works in 2015. However, refurbishment projects are more uncertain than new-build projects. Thus, inter-organizational conflicts are likely to happen, due to the uncertainty and the involvement of many organizations in building refurbishment projects. This suggests that refurbishment projects require inter-organizational integration to reduce the inter-organizational conflict. Therefore, the aim of this study is to develop an inter-organizational integration framework to reduce inter-organizational conflict in building refurbishment projects in Malaysia. This aim is achieved through the following four objectives: (1) to measure the level of uncertainty in building refurbishment projects; (2) to measure the level of inter-organizational conflict in building refurbishment projects; (3) to measure the degree of inter-organizational integration in building refurbishment projects; and (4) to investigate the relationship between uncertainty and inter-organizational conflict and inter-organizational integration as a mediator in building refurbishment projects. The respondents of this study are boundary role persons who represent construction or architectural firms in dealing with other organizations in building refurbishment projects (e.g., project managers, architects, contract managers) from construction and architectural firms in Malaysia. This study adopted the quantitative method of data collection.
format Thesis
author Noori, Adel
spellingShingle Noori, Adel
Inter-organizational integration framework to reduce inter-organizational conflict in building refurbishment projects / Adel Noori
author_facet Noori, Adel
author_sort Noori, Adel
title Inter-organizational integration framework to reduce inter-organizational conflict in building refurbishment projects / Adel Noori
title_short Inter-organizational integration framework to reduce inter-organizational conflict in building refurbishment projects / Adel Noori
title_full Inter-organizational integration framework to reduce inter-organizational conflict in building refurbishment projects / Adel Noori
title_fullStr Inter-organizational integration framework to reduce inter-organizational conflict in building refurbishment projects / Adel Noori
title_full_unstemmed Inter-organizational integration framework to reduce inter-organizational conflict in building refurbishment projects / Adel Noori
title_sort inter-organizational integration framework to reduce inter-organizational conflict in building refurbishment projects / adel noori
publishDate 2018
url https://ir.uitm.edu.my/id/eprint/82721/2/82721.pdf
https://ir.uitm.edu.my/id/eprint/82721/
_version_ 1784517513700179968
score 13.211869