A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen
Complex infrastructure projects, such as highways, bridges, ports, airports, and mass transit, have been characterised as large-scale capital expenditure, longer completion period, require specific technical and more process complexity levels. Their complexity level regardless of their size, cost, l...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2022
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/78319/1/78319.pdf https://ir.uitm.edu.my/id/eprint/78319/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.78319 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.783192023-06-01T07:00:45Z https://ir.uitm.edu.my/id/eprint/78319/ A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen Che Nen, Akhtarul Norfaiza Infrastructure (Economics). Capital. Capital productivity Construction industry Complex infrastructure projects, such as highways, bridges, ports, airports, and mass transit, have been characterised as large-scale capital expenditure, longer completion period, require specific technical and more process complexity levels. Their complexity level regardless of their size, cost, longer duration, and less quality that expected prone to three main consequences during construction including, several design changes, land acquisition, and delaying approval process. Those consequences are warranted an ineffective tool for assessing and managing that complexity factors. So far, several empirical studies pertaining to complex factors reported on weak impact of tripartite project performance (time, cost, and quality) during triple project phases. Hence the project complexity tools still lacking and waiting to be explore either qualitative or quantitative measures throughout the project phases (pre-construction, construction, & post-construction). 2022 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/78319/1/78319.pdf A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen. (2022) PhD thesis, thesis, Universiti Teknologi MARA (UiTM). |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Infrastructure (Economics). Capital. Capital productivity Construction industry |
spellingShingle |
Infrastructure (Economics). Capital. Capital productivity Construction industry Che Nen, Akhtarul Norfaiza A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen |
description |
Complex infrastructure projects, such as highways, bridges, ports, airports, and mass transit, have been characterised as large-scale capital expenditure, longer completion period, require specific technical and more process complexity levels. Their complexity level regardless of their size, cost, longer duration, and less quality that expected prone to three main consequences during construction including, several design changes, land acquisition, and delaying approval process. Those consequences are warranted an ineffective tool for assessing and managing that complexity factors. So far, several empirical studies pertaining to complex factors reported on weak impact of tripartite project performance (time, cost, and quality) during triple project phases. Hence the project complexity tools still lacking and waiting to be explore either qualitative or quantitative measures throughout the project phases (pre-construction, construction, & post-construction). |
format |
Thesis |
author |
Che Nen, Akhtarul Norfaiza |
author_facet |
Che Nen, Akhtarul Norfaiza |
author_sort |
Che Nen, Akhtarul Norfaiza |
title |
A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen |
title_short |
A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen |
title_full |
A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen |
title_fullStr |
A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen |
title_full_unstemmed |
A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen |
title_sort |
two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in malaysia / akhtarul norfaiza che nen |
publishDate |
2022 |
url |
https://ir.uitm.edu.my/id/eprint/78319/1/78319.pdf https://ir.uitm.edu.my/id/eprint/78319/ |
_version_ |
1768011701702098944 |
score |
13.211869 |