A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen

Complex infrastructure projects, such as highways, bridges, ports, airports, and mass transit, have been characterised as large-scale capital expenditure, longer completion period, require specific technical and more process complexity levels. Their complexity level regardless of their size, cost, l...

Full description

Saved in:
Bibliographic Details
Main Author: Che Nen, Akhtarul Norfaiza
Format: Thesis
Language:English
Published: 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/78319/1/78319.pdf
https://ir.uitm.edu.my/id/eprint/78319/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.78319
record_format eprints
spelling my.uitm.ir.783192023-06-01T07:00:45Z https://ir.uitm.edu.my/id/eprint/78319/ A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen Che Nen, Akhtarul Norfaiza Infrastructure (Economics). Capital. Capital productivity Construction industry Complex infrastructure projects, such as highways, bridges, ports, airports, and mass transit, have been characterised as large-scale capital expenditure, longer completion period, require specific technical and more process complexity levels. Their complexity level regardless of their size, cost, longer duration, and less quality that expected prone to three main consequences during construction including, several design changes, land acquisition, and delaying approval process. Those consequences are warranted an ineffective tool for assessing and managing that complexity factors. So far, several empirical studies pertaining to complex factors reported on weak impact of tripartite project performance (time, cost, and quality) during triple project phases. Hence the project complexity tools still lacking and waiting to be explore either qualitative or quantitative measures throughout the project phases (pre-construction, construction, & post-construction). 2022 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/78319/1/78319.pdf A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen. (2022) PhD thesis, thesis, Universiti Teknologi MARA (UiTM).
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Infrastructure (Economics). Capital. Capital productivity
Construction industry
spellingShingle Infrastructure (Economics). Capital. Capital productivity
Construction industry
Che Nen, Akhtarul Norfaiza
A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen
description Complex infrastructure projects, such as highways, bridges, ports, airports, and mass transit, have been characterised as large-scale capital expenditure, longer completion period, require specific technical and more process complexity levels. Their complexity level regardless of their size, cost, longer duration, and less quality that expected prone to three main consequences during construction including, several design changes, land acquisition, and delaying approval process. Those consequences are warranted an ineffective tool for assessing and managing that complexity factors. So far, several empirical studies pertaining to complex factors reported on weak impact of tripartite project performance (time, cost, and quality) during triple project phases. Hence the project complexity tools still lacking and waiting to be explore either qualitative or quantitative measures throughout the project phases (pre-construction, construction, & post-construction).
format Thesis
author Che Nen, Akhtarul Norfaiza
author_facet Che Nen, Akhtarul Norfaiza
author_sort Che Nen, Akhtarul Norfaiza
title A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen
title_short A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen
title_full A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen
title_fullStr A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen
title_full_unstemmed A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen
title_sort two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in malaysia / akhtarul norfaiza che nen
publishDate 2022
url https://ir.uitm.edu.my/id/eprint/78319/1/78319.pdf
https://ir.uitm.edu.my/id/eprint/78319/
_version_ 1768011701702098944
score 13.211869