Construction and completion of anti-climb fencing at Pusat Kecemerlangan Lembaga Getah Malaysia (LGM) Lot 481, Mukim Sungai / Siti Syahirah Ahmad Badli Sah
Enabling works is a must for a huge construction. This report will discuss the construction of Anti Climb Fencing along Persiaran Cakeralawa, Subang Bestari. The purpose of this report is to investigate the requirement resources to construct anti-climb fencing, the equipment, and material used. This...
Saved in:
Main Author: | Ahmad Badli Sah, Siti Syahirah |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/77730/1/77730.pdf https://ir.uitm.edu.my/id/eprint/77730/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Lembaga Getah Malaysia (LGM) / Siti Nur Ain Ramly ... [et al.]
by: Siti Nur Ain, Ramly, et al.
Published: (2019) -
UPM Dan LGM Kaji Kesan Sarung Tangan Getah Asli di kalangan Pekerja Kesihatan
by: Universiti Putra Malaysia, Bahagian Komunikasi Korporat
Published: (2009) -
LGM hasilkan mesin bantu penoreh
by: Anon
Published: (2012) -
Learning styles: A review / Badli Esham Ahmad
by: Ahmad, Badli Esham
Published: (2006) -
Perspectives of consumer towards Istihalah / Nor Liyana Badli
by: Badli, Nor Liyana
Published: (2014)