Preparation of document tender / Mohd Razif Mustafa
Tender is the process by which bids are invited from interested contractors to carry out specific packages of construction work. It should adopt and observe the key values of fairness, clarity, simplicity and accountability, as well as reinforce the idea that the apportionment of risk to the party b...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2014
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/77666/1/77666.pdf https://ir.uitm.edu.my/id/eprint/77666/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.77666 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.776662023-12-12T06:47:56Z https://ir.uitm.edu.my/id/eprint/77666/ Preparation of document tender / Mohd Razif Mustafa Mustafa, Mohd Razif Management of the construction site. Superintendence of building construction Tender is the process by which bids are invited from interested contractors to carry out specific packages of construction work. It should adopt and observe the key values of fairness, clarity, simplicity and accountability, as well as reinforce the idea that the apportionment of risk to the party best placed to access and manage it is fundamental to the success of a project. The two most commonly used methods of tendering are single stages select selective tendering or two-stage selective tendering. Both involve the invitation of tenders from firm on a pre-approved or ad hoc list, chosen because they meet certain minimum standard in general criteria such as financial standing, experience, capability and competence. The competition element of the tender is provided on the basis of price and quality. The main difference between the two is that in the two-stages process, the contractor becomes involved in the planning of the project at an earlier stages, so they are submitted on the basis of minimal information, and in the second stages the employer's team will develop the precise specification in conjunction with the tenderer. This method is favoured in more complex project, where the contractor may have the significant design input. Universiti Teknologi MARA, Perak 2014 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/77666/1/77666.pdf Preparation of document tender / Mohd Razif Mustafa. (2014) Industrial Training. Universiti Teknologi MARA, Perak. <http://terminalib.uitm.edu.my/77666.pdf> (Submitted) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Management of the construction site. Superintendence of building construction |
spellingShingle |
Management of the construction site. Superintendence of building construction Mustafa, Mohd Razif Preparation of document tender / Mohd Razif Mustafa |
description |
Tender is the process by which bids are invited from interested contractors to carry out specific packages of construction work. It should adopt and observe the key values of fairness, clarity, simplicity and accountability, as well as reinforce the idea that the apportionment of risk to the party best placed to access and manage it is fundamental to the success of a project. The two most commonly used methods of tendering are single stages select selective tendering or two-stage selective tendering. Both involve the invitation of tenders from firm on a pre-approved or ad hoc list, chosen because they meet certain minimum standard in general criteria such as financial standing, experience, capability and competence. The competition element of the tender is provided on the basis of price and quality. The main difference between the two is that in the two-stages process, the contractor becomes involved in the planning of the project at an earlier stages, so they are submitted on the basis of minimal information, and in the second stages the employer's team will develop the precise specification in conjunction with the tenderer. This method is favoured in more complex project, where the contractor may have the significant design input. |
format |
Monograph |
author |
Mustafa, Mohd Razif |
author_facet |
Mustafa, Mohd Razif |
author_sort |
Mustafa, Mohd Razif |
title |
Preparation of document tender / Mohd Razif Mustafa |
title_short |
Preparation of document tender / Mohd Razif Mustafa |
title_full |
Preparation of document tender / Mohd Razif Mustafa |
title_fullStr |
Preparation of document tender / Mohd Razif Mustafa |
title_full_unstemmed |
Preparation of document tender / Mohd Razif Mustafa |
title_sort |
preparation of document tender / mohd razif mustafa |
publisher |
Universiti Teknologi MARA, Perak |
publishDate |
2014 |
url |
https://ir.uitm.edu.my/id/eprint/77666/1/77666.pdf https://ir.uitm.edu.my/id/eprint/77666/ |
_version_ |
1787139501347307520 |
score |
13.211869 |