The design and preparation of specification for air conditioning system for the School of Hotel and Catering ITM, Shah Alam / Najib Hashim and Azhar Mohammad

This final year project report has been compiled with, the primary aim of describing on the project that we had done for the period of three semester as a part of fulfilment for the award of Advanced Diploma In Mechanical Engineering. The main objective of this project is to Design and Prepare the S...

Full description

Saved in:
Bibliographic Details
Main Authors: Hashim, Najib, Mohammad, Azhar
Format: Student Project
Language:English
Published: 1991
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/74572/1/74572.pdf
https://ir.uitm.edu.my/id/eprint/74572/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This final year project report has been compiled with, the primary aim of describing on the project that we had done for the period of three semester as a part of fulfilment for the award of Advanced Diploma In Mechanical Engineering. The main objective of this project is to Design and Prepare the Specification of Air-conditioning System for the School of Hotel and Catering,ITM, Shah Alam. Basically there are two main blocks at the Hotel and Catering building: Block A -Academic block consist of two levels. It includes the Lecture theatre, Instructor room, Administration office, Computer Library, Lecturer's room etc.