Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri

Tasik Puteri in Bukit Besi is a man-made lake that occupies approximately 131 hectares. The lake’s outflow is focus at one point and varies throughout the year, depends on the rainfall rate. The outflows drops approximately 15 meters. It is difficult to fully utilise the energy from the Tasik Puteri...

Full description

Saved in:
Bibliographic Details
Main Author: Ahmad Sabri, Ahmad Farris Isyraf
Format: Student Project
Language:English
Published: 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/70205/1/70205.pdf
https://ir.uitm.edu.my/id/eprint/70205/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.70205
record_format eprints
spelling my.uitm.ir.702052022-11-15T04:35:15Z https://ir.uitm.edu.my/id/eprint/70205/ Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri Ahmad Sabri, Ahmad Farris Isyraf Mechanical and electrical engineering combined Power resources Energy consumption Energy conservation Power plants Renewable energy sources Tasik Puteri in Bukit Besi is a man-made lake that occupies approximately 131 hectares. The lake’s outflow is focus at one point and varies throughout the year, depends on the rainfall rate. The outflows drops approximately 15 meters. It is difficult to fully utilise the energy from the Tasik Puteri outflow since Terengganu has a rainy season at the end of the year and a sunny season at the beginning of the year. The objectives of the project are to determine the estimated eletricity power potential of the lake and to propose estimated electricity power potential for this micro-hydropower plant.In doing so, desk literature review is conducted.lt is expected from this research, the energy power potential from this study can be determined . The expected results for this project would be estimated electricity power potential of the lake and the concept proposed for the development including the type and capacity of the model. The range of power to be produced from lOOkW to 250kW. 2022-01 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/70205/1/70205.pdf Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri. (2022) [Student Project] <http://terminalib.uitm.edu.my/70205.pdf> (Submitted)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Mechanical and electrical engineering combined
Power resources
Energy consumption
Energy conservation
Power plants
Renewable energy sources
spellingShingle Mechanical and electrical engineering combined
Power resources
Energy consumption
Energy conservation
Power plants
Renewable energy sources
Ahmad Sabri, Ahmad Farris Isyraf
Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri
description Tasik Puteri in Bukit Besi is a man-made lake that occupies approximately 131 hectares. The lake’s outflow is focus at one point and varies throughout the year, depends on the rainfall rate. The outflows drops approximately 15 meters. It is difficult to fully utilise the energy from the Tasik Puteri outflow since Terengganu has a rainy season at the end of the year and a sunny season at the beginning of the year. The objectives of the project are to determine the estimated eletricity power potential of the lake and to propose estimated electricity power potential for this micro-hydropower plant.In doing so, desk literature review is conducted.lt is expected from this research, the energy power potential from this study can be determined . The expected results for this project would be estimated electricity power potential of the lake and the concept proposed for the development including the type and capacity of the model. The range of power to be produced from lOOkW to 250kW.
format Student Project
author Ahmad Sabri, Ahmad Farris Isyraf
author_facet Ahmad Sabri, Ahmad Farris Isyraf
author_sort Ahmad Sabri, Ahmad Farris Isyraf
title Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri
title_short Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri
title_full Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri
title_fullStr Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri
title_full_unstemmed Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri
title_sort assessing hydro power as an alternative energy in bukit besi / ahmad farris isyraf ahmad sabri
publishDate 2022
url https://ir.uitm.edu.my/id/eprint/70205/1/70205.pdf
https://ir.uitm.edu.my/id/eprint/70205/
_version_ 1751540000649904128
score 13.211869