Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri
Tasik Puteri in Bukit Besi is a man-made lake that occupies approximately 131 hectares. The lake’s outflow is focus at one point and varies throughout the year, depends on the rainfall rate. The outflows drops approximately 15 meters. It is difficult to fully utilise the energy from the Tasik Puteri...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2022
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/70205/1/70205.pdf https://ir.uitm.edu.my/id/eprint/70205/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.70205 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.702052022-11-15T04:35:15Z https://ir.uitm.edu.my/id/eprint/70205/ Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri Ahmad Sabri, Ahmad Farris Isyraf Mechanical and electrical engineering combined Power resources Energy consumption Energy conservation Power plants Renewable energy sources Tasik Puteri in Bukit Besi is a man-made lake that occupies approximately 131 hectares. The lake’s outflow is focus at one point and varies throughout the year, depends on the rainfall rate. The outflows drops approximately 15 meters. It is difficult to fully utilise the energy from the Tasik Puteri outflow since Terengganu has a rainy season at the end of the year and a sunny season at the beginning of the year. The objectives of the project are to determine the estimated eletricity power potential of the lake and to propose estimated electricity power potential for this micro-hydropower plant.In doing so, desk literature review is conducted.lt is expected from this research, the energy power potential from this study can be determined . The expected results for this project would be estimated electricity power potential of the lake and the concept proposed for the development including the type and capacity of the model. The range of power to be produced from lOOkW to 250kW. 2022-01 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/70205/1/70205.pdf Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri. (2022) [Student Project] <http://terminalib.uitm.edu.my/70205.pdf> (Submitted) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Mechanical and electrical engineering combined Power resources Energy consumption Energy conservation Power plants Renewable energy sources |
spellingShingle |
Mechanical and electrical engineering combined Power resources Energy consumption Energy conservation Power plants Renewable energy sources Ahmad Sabri, Ahmad Farris Isyraf Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri |
description |
Tasik Puteri in Bukit Besi is a man-made lake that occupies approximately 131 hectares. The lake’s outflow is focus at one point and varies throughout the year, depends on the rainfall rate. The outflows drops approximately 15 meters. It is difficult to fully utilise the energy from the Tasik Puteri outflow since Terengganu has a rainy season at the end of the year and a sunny season at the beginning of the year. The objectives of the project are to determine the estimated eletricity power potential of the lake and to propose estimated electricity power potential for this micro-hydropower plant.In doing so, desk literature review is conducted.lt is expected from this research, the energy power potential from this study can be determined . The expected results for this project would be estimated electricity power potential of the lake and the concept proposed for the development including the type and capacity of the model. The range of power to be produced from lOOkW to 250kW. |
format |
Student Project |
author |
Ahmad Sabri, Ahmad Farris Isyraf |
author_facet |
Ahmad Sabri, Ahmad Farris Isyraf |
author_sort |
Ahmad Sabri, Ahmad Farris Isyraf |
title |
Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri |
title_short |
Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri |
title_full |
Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri |
title_fullStr |
Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri |
title_full_unstemmed |
Assessing hydro power as an alternative energy in Bukit Besi / Ahmad Farris Isyraf Ahmad Sabri |
title_sort |
assessing hydro power as an alternative energy in bukit besi / ahmad farris isyraf ahmad sabri |
publishDate |
2022 |
url |
https://ir.uitm.edu.my/id/eprint/70205/1/70205.pdf https://ir.uitm.edu.my/id/eprint/70205/ |
_version_ |
1751540000649904128 |
score |
13.211869 |