Factors of construction delay at rural area in Sarawak / Ahmad Alif Rahimi Zamzuriarepen

The construction industry is a major industry that contributes to Malaysia's economic development. However, delay in construction becomes the worse issue. In Malaysia, only 30% of the public sector building project finished within the schedule, and another 70% is completed beyond the project...

Full description

Saved in:
Bibliographic Details
Main Author: Zamzuriarepen, Ahmad Alif Rahimi
Format: Student Project
Language:English
Published: 2021
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/66555/1/66555.pdf
https://ir.uitm.edu.my/id/eprint/66555/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.66555
record_format eprints
spelling my.uitm.ir.665552022-09-19T04:38:13Z https://ir.uitm.edu.my/id/eprint/66555/ Factors of construction delay at rural area in Sarawak / Ahmad Alif Rahimi Zamzuriarepen Zamzuriarepen, Ahmad Alif Rahimi Rural groups. Rural sociology NA Architecture Human factors and architecture The construction industry is a major industry that contributes to Malaysia's economic development. However, delay in construction becomes the worse issue. In Malaysia, only 30% of the public sector building project finished within the schedule, and another 70% is completed beyond the project schedule. The studies have been done delay in Malaysia construction project stated that 17.3% from 417 government projects is a delay. This research aims to ascertain the factor of construction delay in a rural area among contractors in Sarawak. Therefore, this research will study the factor causing project delays in a rural area, identify the implication of project delay in a rural area, and determine the strategies in mitigating project delay in a rural area. 238 set of questionnaires was distributed to the contractor company grade G1 until G5 at Kuching Sarawak. This research employed descriptive analysis, and the result was calculated using the average index method. Overall the result shows the respondent has a high level of agreement on the factor of causing delay, the implication of project delay, and strategies to mitigate project delay. However, the finding revealed that late payment or underpayment by the client, difficulty delivering construction material to the construction site, and high cost of material due to additional delivery costs to rural site construction is the most factor causing construction delay. This may cause time overrun and cost overrun. It also causes a bad reputation for the contractor. Therefore, the research result can be used for the factor of construction delay and the implication. 2021 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/66555/1/66555.pdf Factors of construction delay at rural area in Sarawak / Ahmad Alif Rahimi Zamzuriarepen. (2021) [Student Project] (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Rural groups. Rural sociology
NA Architecture
Human factors and architecture
spellingShingle Rural groups. Rural sociology
NA Architecture
Human factors and architecture
Zamzuriarepen, Ahmad Alif Rahimi
Factors of construction delay at rural area in Sarawak / Ahmad Alif Rahimi Zamzuriarepen
description The construction industry is a major industry that contributes to Malaysia's economic development. However, delay in construction becomes the worse issue. In Malaysia, only 30% of the public sector building project finished within the schedule, and another 70% is completed beyond the project schedule. The studies have been done delay in Malaysia construction project stated that 17.3% from 417 government projects is a delay. This research aims to ascertain the factor of construction delay in a rural area among contractors in Sarawak. Therefore, this research will study the factor causing project delays in a rural area, identify the implication of project delay in a rural area, and determine the strategies in mitigating project delay in a rural area. 238 set of questionnaires was distributed to the contractor company grade G1 until G5 at Kuching Sarawak. This research employed descriptive analysis, and the result was calculated using the average index method. Overall the result shows the respondent has a high level of agreement on the factor of causing delay, the implication of project delay, and strategies to mitigate project delay. However, the finding revealed that late payment or underpayment by the client, difficulty delivering construction material to the construction site, and high cost of material due to additional delivery costs to rural site construction is the most factor causing construction delay. This may cause time overrun and cost overrun. It also causes a bad reputation for the contractor. Therefore, the research result can be used for the factor of construction delay and the implication.
format Student Project
author Zamzuriarepen, Ahmad Alif Rahimi
author_facet Zamzuriarepen, Ahmad Alif Rahimi
author_sort Zamzuriarepen, Ahmad Alif Rahimi
title Factors of construction delay at rural area in Sarawak / Ahmad Alif Rahimi Zamzuriarepen
title_short Factors of construction delay at rural area in Sarawak / Ahmad Alif Rahimi Zamzuriarepen
title_full Factors of construction delay at rural area in Sarawak / Ahmad Alif Rahimi Zamzuriarepen
title_fullStr Factors of construction delay at rural area in Sarawak / Ahmad Alif Rahimi Zamzuriarepen
title_full_unstemmed Factors of construction delay at rural area in Sarawak / Ahmad Alif Rahimi Zamzuriarepen
title_sort factors of construction delay at rural area in sarawak / ahmad alif rahimi zamzuriarepen
publishDate 2021
url https://ir.uitm.edu.my/id/eprint/66555/1/66555.pdf
https://ir.uitm.edu.my/id/eprint/66555/
_version_ 1744651640185552896
score 13.211869