Piling Tool Graph Set / Noraisyah Mohamad … [et al.]
Piling Tool Graph is created to reduce problem that emerges in the construction place. Problem which arise here was the risk when the labourer taking the graph during the piling which set in the soil by manual method. With "Piling Tool Graph Set" this problem could be overcome and it is ab...
Saved in:
Main Authors: | Mohamad, Noraisyah, Hussin, Juliyana, Abd Rahman, Mohd Fazli, Mat, Mazziyatol Farizza |
---|---|
Format: | Book Section |
Language: | English |
Published: |
Bahagian Penyelidikan dan Jaringan Industri, UiTM Melaka
2012
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/65904/1/65904.pdf https://ir.uitm.edu.my/id/eprint/65904/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The application of design and build system a main contractual procurement in Malaysia / Siti Noorazamimah Abdullah
by: Abdullah, Siti Noorazamimah
Published: (2006) -
Customer understanding and confident toward service quality in construction industry / Amiezaitul Asyikin Berahim
by: Berahim, Amiezaitul Asyikin
Published: (2015) -
A study on safety climate at construction site Gerbang Nusajaya Sdn Bhd / Nurul Etylia Jefli and Nurul Asmida Hailudin
by: Jefli, Nurul Etylia, et al.
Published: (2016) -
The catalyst for property development in Bandar Tasik Selatan / Munirah Rosli
by: Rosli, Munirah
Published: (2010) -
Recognition of income in property development company a critical study and evaluation / Mohd. Sopiyan Rashdi
by: Rashdi, Mohd. Sopiyan
Published: (1987)