The impact of variation orders on the cost of mosque construction projects in Perak, Malaysia: A case study / Mohd Nazri Abdullah ... [et al.]

This research investigates the impact on costing from variation order of ten (10) mosques in Perak, Malaysia derived from different stakeholders. Variation order were treated variedly according to the conditions of contract of the particular construction. This study focused on mosque project in Pera...

Full description

Saved in:
Bibliographic Details
Main Authors: Abdullah, Mohd Nazri, Syed Mustapa, Syed Haris, Zainal Abidin, Zaiwanizar, Shuib, Mohammad Nasharudine, Mamat, Mohd Esham
Format: Conference or Workshop Item
Language:English
Published: 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/65678/1/65678.pdf
https://ir.uitm.edu.my/id/eprint/65678/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.65678
record_format eprints
spelling my.uitm.ir.656782023-03-09T07:40:59Z https://ir.uitm.edu.my/id/eprint/65678/ The impact of variation orders on the cost of mosque construction projects in Perak, Malaysia: A case study / Mohd Nazri Abdullah ... [et al.] Abdullah, Mohd Nazri Syed Mustapa, Syed Haris Zainal Abidin, Zaiwanizar Shuib, Mohammad Nasharudine Mamat, Mohd Esham QA Mathematics Analysis Analytical methods used in the solution of physical problems This research investigates the impact on costing from variation order of ten (10) mosques in Perak, Malaysia derived from different stakeholders. Variation order were treated variedly according to the conditions of contract of the particular construction. This study focused on mosque project in Perak as per Public Work Department condition of contract which is Public Work Department Form of Contract PWD203a 2010 with quantity and Public Work Department Form of Contract PWD203 2010 with drawings and specifications. Both of the article of agreement partakes different approach on variation order calculation specifically on cost incurred. This paper aims to analyze variation order towards the costing of mosque construction in Perak, Malaysia and identify the cost distribution among the stakeholders of the mosque constructions in Perak, Malaysia. Employing analytical research that adopted qualitative method of case study and document review, a total of 10 mosques were analysed in Perak, Malaysia. From the study, it was revealed that the total variation order cost for the ten (10) mosque is RM417,479.79. Some variations are either beneficial or detrimental to the overall contract sum. The order of ranks of stakeholders contributing to variation order cost starting from the highest contributor to the lowest contributor are civil engineering, mechanical and electrical engineering, client, architect, contractor, quantity surveyor and lastly government authorities. 2022 Conference or Workshop Item PeerReviewed text en https://ir.uitm.edu.my/id/eprint/65678/1/65678.pdf The impact of variation orders on the cost of mosque construction projects in Perak, Malaysia: A case study / Mohd Nazri Abdullah ... [et al.]. (2022) In: Virtual Go Green: Conference and Publication (v-Gogreen 2021) “Rethinking Built Environment: Towards a Sustainable Future” 29th-30th September 2021, 29 - 30 September, Universiti Teknologi MARA, Cawangan Perak.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic QA Mathematics
Analysis
Analytical methods used in the solution of physical problems
spellingShingle QA Mathematics
Analysis
Analytical methods used in the solution of physical problems
Abdullah, Mohd Nazri
Syed Mustapa, Syed Haris
Zainal Abidin, Zaiwanizar
Shuib, Mohammad Nasharudine
Mamat, Mohd Esham
The impact of variation orders on the cost of mosque construction projects in Perak, Malaysia: A case study / Mohd Nazri Abdullah ... [et al.]
description This research investigates the impact on costing from variation order of ten (10) mosques in Perak, Malaysia derived from different stakeholders. Variation order were treated variedly according to the conditions of contract of the particular construction. This study focused on mosque project in Perak as per Public Work Department condition of contract which is Public Work Department Form of Contract PWD203a 2010 with quantity and Public Work Department Form of Contract PWD203 2010 with drawings and specifications. Both of the article of agreement partakes different approach on variation order calculation specifically on cost incurred. This paper aims to analyze variation order towards the costing of mosque construction in Perak, Malaysia and identify the cost distribution among the stakeholders of the mosque constructions in Perak, Malaysia. Employing analytical research that adopted qualitative method of case study and document review, a total of 10 mosques were analysed in Perak, Malaysia. From the study, it was revealed that the total variation order cost for the ten (10) mosque is RM417,479.79. Some variations are either beneficial or detrimental to the overall contract sum. The order of ranks of stakeholders contributing to variation order cost starting from the highest contributor to the lowest contributor are civil engineering, mechanical and electrical engineering, client, architect, contractor, quantity surveyor and lastly government authorities.
format Conference or Workshop Item
author Abdullah, Mohd Nazri
Syed Mustapa, Syed Haris
Zainal Abidin, Zaiwanizar
Shuib, Mohammad Nasharudine
Mamat, Mohd Esham
author_facet Abdullah, Mohd Nazri
Syed Mustapa, Syed Haris
Zainal Abidin, Zaiwanizar
Shuib, Mohammad Nasharudine
Mamat, Mohd Esham
author_sort Abdullah, Mohd Nazri
title The impact of variation orders on the cost of mosque construction projects in Perak, Malaysia: A case study / Mohd Nazri Abdullah ... [et al.]
title_short The impact of variation orders on the cost of mosque construction projects in Perak, Malaysia: A case study / Mohd Nazri Abdullah ... [et al.]
title_full The impact of variation orders on the cost of mosque construction projects in Perak, Malaysia: A case study / Mohd Nazri Abdullah ... [et al.]
title_fullStr The impact of variation orders on the cost of mosque construction projects in Perak, Malaysia: A case study / Mohd Nazri Abdullah ... [et al.]
title_full_unstemmed The impact of variation orders on the cost of mosque construction projects in Perak, Malaysia: A case study / Mohd Nazri Abdullah ... [et al.]
title_sort impact of variation orders on the cost of mosque construction projects in perak, malaysia: a case study / mohd nazri abdullah ... [et al.]
publishDate 2022
url https://ir.uitm.edu.my/id/eprint/65678/1/65678.pdf
https://ir.uitm.edu.my/id/eprint/65678/
_version_ 1761622277970984960
score 13.211869